9971 Quail Blvd
Austin, TX 78758
About 50 feet of retaining wall to be rebuilt in Austin
A roughly 50-foot section of retaining wall is being rebuilt at 9971 Quail Blvd in Austin. The City of Austin permit was filed on November 22, 2023, and describes the wall as about 6 feet from the city right-of-way.
Summarized from City of Austin records · updated Nov 22, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 22, 2023
- since Nov 22, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRebuild 50 +/- of retaining wall. wall is 6 +/- from city row
- AppliedSep 28, 2023
- IssuedNov 22, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 27, 2023
Passed final inspection Dec 27, 2023.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectRebuild 50 +/- of retaining wall. wall is 6 +/- from city row
Rebuild 50 +/- of retaining wall. wall is 6 +/- from city row
City of Austin permitBuilding PermitFinal- Record
- 2023-142596 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9971 Quail Blvd
What is being built at 9971 Quail Blvd?
A City of Austin permit describes rebuilding about 50 feet of retaining wall at the address.
When was the retaining wall work permitted?
The permit was filed on November 22, 2023. It is permit 2023-142596 BP.
How long is the retaining wall being rebuilt at 9971 Quail Blvd?
The permit describes about 50 feet of retaining wall to be rebuilt.
How far is the wall from the city right-of-way?
The permit description says the wall is about 6 feet from the city right-of-way.
What is the status of the permit for 9971 Quail Blvd?
The City of Austin permit, 2023-142596 BP, has a status of Final.
Also being built nearby
All of 78758- 1101 Mearns Meadow BlvdMar 2, 2007Rutland detention pond & park improvements · 94 m away
- 1070 Mearns Meadow BlvdJul 16, 2026Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 1129-1/2 Mearns Meadow BlvdApr 20, 2021Little walnut creek- flood risk reduction from metric to rutland (with r sp-2018-0337d) · 163 m away
- 1200 Mearns Meadow BlvdMay 26, 2026No meter cans. no change. just replacing the wire from junction box to existing meters for apartment complex. no espa. emergency permit. unit 245 · 178 m away
- 915 W Village LnAug 26, 2026Express - replace (2) sliding glass patio doors size for size · 203 m away
- 9600 Blue Creek LnFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replace 2.5 ton heat pump system with new trane. new xr14 condenser and tem air handler on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 205 m away
- 914 W Village LnFeb 22, 2024Express: replace 6 windows like for like · 206 m away
- 913 W Village LnJun 13, 2025Replacement of complete existing central heat and air system with or without duct work west village lane - replace existing upstairs 1.5 ton air handler and straight cool condenser with a new 1.5 ton air handler electric heat kit and condenser only ( no ducts are being replaced) · 208 m away
- 909 W Meadowmere LnMay 26, 2026Replacement of complete existing central heat and air system with or without duct work replacing like for like 2.5t furdown · 227 m away
- 9920 Quail BlvdJun 29, 2026Remove and replace windows like for like. (1st and 2nd floor - 208 windows total) · 245 m away
- 911 Silver Quail LnSep 4, 2025We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced · 266 m away
- 1001 Bird Creek DrAug 6, 2026*emergency* existing meter can has started to fail causing arcing. replacing the meter can and main panel · 281 m away