groundranger
Recent · latest filing Sep 2025Residential

911 Silver Quail Ln

Austin, TX 78758

911 Silver Quail Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 911 Silver Quail Ln, Austin, TX 78758. The most recent, filed September 4, 2025, covers: “We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced”.

Compiled from City of Austin records · updated Sep 4, 2025

Projects
1
1 filings
Latest filing
Sep 4, 2025
since Sep 4, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced

  1. AppliedSep 2, 2025
  2. IssuedSep 4, 2025
  3. WorkSep '25 – Sep '25
  4. Final inspectionSep 26, 2025

Passed final inspection Sep 26, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced

    We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 911 Silver Quail Ln

What is being built at 911 Silver Quail Ln?

The latest filing (City of Austin permit 2025-111175 EP, September 4, 2025) covers we will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced.

How many permits and filings does 911 Silver Quail Ln have?

1 filing across 1 project, from September 4, 2025 to September 4, 2025.

Is there other construction near 911 Silver Quail Ln?

Yes. Nearby filings include 904 Silver Quail Ln (replacement of complete existing central heat and air system with or without duct work lisa sperry, Jul 31, 2026); 906 Quail Forest Cv (run new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair, Apr 28, 2025); 904 Quail Forest Cv (replacement of mini-split system, Aug 21, 2024).

How do I get alerts for new permits at 911 Silver Quail Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78758
Email me when a new permit is filed