906 Quail Forest Cv
Austin, TX 78758
906 Quail Forest Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 906 Quail Forest Cv, Austin, TX 78758. The most recent, filed April 28, 2025, covers: “Run new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair”.
Compiled from City of Austin records · updated Apr 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 28, 2025
- since Apr 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRun new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair
- AppliedApr 23, 2025
- IssuedApr 28, 2025
- WorkApr '25 – May '25
- Final inspectionMay 13, 2025
Passed final inspection May 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectRun new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair
Run new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair
City of Austin permitPlumbing PermitFinal- Record
- 2025-050037 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 906 Quail Forest Cv
What is being built at 906 Quail Forest Cv?
The latest filing (City of Austin permit 2025-050037 PP, April 28, 2025) covers run new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair.
How many permits and filings does 906 Quail Forest Cv have?
1 filing across 1 project, from April 28, 2025 to April 28, 2025.
Is there other construction near 906 Quail Forest Cv?
Yes. Nearby filings include 904 Quail Forest Cv (replacement of mini-split system, Aug 21, 2024); 903 Quail Forest Cv (replacement of an existing water heater, Apr 9, 2025); 9507 Blue Creek Ln (replacement of an existing water heater standard 40 gal electric water heater change out, Apr 15, 2025).
How do I get alerts for new permits at 906 Quail Forest Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 904 Quail Forest CvAug 21, 2024Replacement of mini-split system · 8 m away
- 903 Quail Forest CvApr 9, 2025Replacement of an existing water heater · 28 m away
- 9507 Blue Creek LnApr 15, 2025Replacement of an existing water heater standard 40 gal electric water heater change out · 29 m away
- 907 Quail Forest CvDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 40 m away
- 911 Silver Quail LnSep 4, 2025We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced · 44 m away
- 904 Silver Quail LnJul 31, 2026Replacement of complete existing central heat and air system with or without duct work lisa sperry · 57 m away
- 906 Park Village CvJul 7, 2025Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 901 Park Village CvJan 2, 2024Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 9525 Quail Village LnOct 30, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 123 m away
- 9600 Blue Creek LnFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replace 2.5 ton heat pump system with new trane. new xr14 condenser and tem air handler on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 137 m away
- 9625 Covy Ridge LnMay 7, 2026Replacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal electric system · 154 m away
- 913 E Village LnApr 28, 2025Replacement of complete existing central heat and air system with or without duct work · 180 m away