906 Park Village Cv
Austin, TX 78758
906 Park Village Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 906 Park Village Cv, Austin, TX 78758. The most recent, filed July 7, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 7, 2025
- since Jul 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 30, 2025
- IssuedJul 7, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 9, 2025
Passed final inspection Jul 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-067148 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 906 Park Village Cv
What is being built at 906 Park Village Cv?
The latest filing (City of Austin permit 2025-067148 MP, July 7, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 906 Park Village Cv have?
1 filing across 1 project, from July 7, 2025 to July 7, 2025.
Is there other construction near 906 Park Village Cv?
Yes. Nearby filings include 901 Park Village Cv (replacement of complete existing central heat and air system with or without duct work, Jan 2, 2024); 903 Quail Forest Cv (replacement of an existing water heater, Apr 9, 2025); 907 Quail Forest Cv (replacement of complete existing central heat and air system with or without duct work, Dec 15, 2025).
How do I get alerts for new permits at 906 Park Village Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 901 Park Village CvJan 2, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 903 Quail Forest CvApr 9, 2025Replacement of an existing water heater · 61 m away
- 907 Quail Forest CvDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 9507 Blue Creek LnApr 15, 2025Replacement of an existing water heater standard 40 gal electric water heater change out · 72 m away
- 904 Quail Forest CvAug 21, 2024Replacement of mini-split system · 74 m away
- 906 Quail Forest CvApr 28, 2025Run new line from the water meter to the main water manifold in the garage. shall include breaking the asphalt excavation of the trench installation of the new line penetrating the exterior wall cutting open access in the sheetrock inside the garage and drilling holes in the studs to run the new line. does not cover sheetrock or asphalt repair · 81 m away
- 911 Silver Quail LnSep 4, 2025We will be replacing old 100a ge load center with new sqaure d hom load center. existing ge panel is very old and needs to be replaced · 124 m away
- 904 Silver Quail LnJul 31, 2026Replacement of complete existing central heat and air system with or without duct work lisa sperry · 133 m away
- 9525 Quail Village LnOct 30, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 134 m away
- 1115 Rutland DrMar 28, 2024Re-roof · 191 m away
- 9625 Covy Ridge LnMay 7, 2026Replacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal electric system · 217 m away
- 9600 Blue Creek LnFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replace 2.5 ton heat pump system with new trane. new xr14 condenser and tem air handler on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 217 m away