10120 Spicewood Mesa
Austin, TX 78759
10120 Spicewood Mesa: 2 projects on record
City of Austin lists 2 filings across 2 projects at 10120 Spicewood Mesa, Austin, TX 78759. The most recent, filed January 16, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas”.
Compiled from City of Austin records · updated Jan 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jan 16, 2025
- since Jan 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas
- AppliedJan 3, 2025
- IssuedJan 16, 2025
- WorkJan '25 – Feb '25
- Final inspectionFeb 5, 2025
Passed final inspection Feb 5, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas
City of Austin permitMechanical PermitFinal- Record
- 2025-000653 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace 24 windows like for like
Express: replace 24 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2023-104708 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10120 Spicewood Mesa
What is being built at 10120 Spicewood Mesa?
The latest filing (City of Austin permit 2025-000653 MP, January 16, 2025) covers replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas.
How many permits and filings does 10120 Spicewood Mesa have?
2 filings across 2 projects, from January 16, 2025 to January 16, 2025.
Is there other construction near 10120 Spicewood Mesa?
Yes. Nearby filings include 10202 Spicewood Mesa (adding surge protection and grounding system to 125amp main breaker panel no meter work being done. austin energy is the electrical provider, Jul 21, 2026); 8504 Spicewood Mesa Cv (downstairs only - replacement of complete existing central heat and air system with or without duct work, Jun 7, 2024); 10206 Spicewood Mesa (express - tub to shower conversion, Nov 13, 2025).
How do I get alerts for new permits at 10120 Spicewood Mesa?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10202 Spicewood MesaJul 21, 2026Adding surge protection and grounding system to 125amp main breaker panel no meter work being done. austin energy is the electrical provider · 67 m away
- 8504 Spicewood Mesa CvJun 7, 2024Downstairs only - replacement of complete existing central heat and air system with or without duct work · 89 m away
- 10206 Spicewood MesaNov 13, 2025Express - tub to shower conversion · 118 m away
- 10111 Spicewood MesaNov 3, 2026Prv replacement · 125 m away
- 8500 Spicewood Mesa CvNov 10, 2026Upgrade of existing underground service to 120/240 volts 200 amp with current codes and standards · 128 m away
- 10110 Spicewood MesaDec 4, 2023Installation of new 7.2 kw solar pv system · 131 m away
- 10205 Vaquero TrlApr 2, 2026Installation of 7.6kw pv solar system · 142 m away
- 10208 Spicewood MesaJun 19, 2024Irrigation install · 147 m away
- 10200 Vaquero TrlDec 15, 2023Disconnect/reconnect power for main distribution panel upgrade only. we are not upgrading the size of the service not upgrading the meter size · 154 m away
- 10210 Spicewood MesaNov 4, 2026200amp outdoor panel replacement adding grounding and surge protection. no meter work. ae is the electrical provider · 173 m away
- 8502 Del Mesa LnJun 5, 2026Service upgrade · 176 m away
- 10120 Vaquero TrlApr 30, 2024Install new 9.660kw rooftop solar system for existing residential only · 198 m away