10208 Spicewood Mesa
Austin, TX 78759
10208 Spicewood Mesa: 1 project on record
City of Austin lists 1 filing across 1 project at 10208 Spicewood Mesa, Austin, TX 78759. The most recent, filed June 19, 2024, covers: “Irrigation install”.
Compiled from City of Austin records · updated Jun 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 19, 2024
- since Jun 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIrrigation install
- AppliedDec 6, 2023
- IssuedJun 19, 2024
- WorkJun '24 – Aug '24
- Final inspectionAug 15, 2024
Passed final inspection Aug 15, 2024.
Permit & project history
1 projectIrrigation install
Irrigation install
City of Austin permitPlumbing PermitFinal- Record
- 2023-156049 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10208 Spicewood Mesa
What is being built at 10208 Spicewood Mesa?
The latest filing (City of Austin permit 2023-156049 PP, June 19, 2024) covers irrigation install.
How many permits and filings does 10208 Spicewood Mesa have?
1 filing across 1 project, from June 19, 2024 to June 19, 2024.
Is there other construction near 10208 Spicewood Mesa?
Yes. Nearby filings include 10210 Spicewood Mesa (200amp outdoor panel replacement adding grounding and surge protection. no meter work. ae is the electrical provider, Nov 4, 2026); 10206 Spicewood Mesa (express - tub to shower conversion, Nov 13, 2025); 10205 Vaquero Trl (installation of 7.6kw pv solar system, Apr 2, 2026).
How do I get alerts for new permits at 10208 Spicewood Mesa?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10210 Spicewood MesaNov 4, 2026200amp outdoor panel replacement adding grounding and surge protection. no meter work. ae is the electrical provider · 26 m away
- 10206 Spicewood MesaNov 13, 2025Express - tub to shower conversion · 30 m away
- 10205 Vaquero TrlApr 2, 2026Installation of 7.6kw pv solar system · 60 m away
- 10202 Spicewood MesaJul 21, 2026Adding surge protection and grounding system to 125amp main breaker panel no meter work being done. austin energy is the electrical provider · 85 m away
- 10214 Spicewood MesaJan 17, 2024Express - installing 18 windows like for like · 88 m away
- 10217 Spicewood MesaJun 3, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 8404 Vaquero CvAug 17, 2026Expansion of 3.0kw solar pv system · 125 m away
- 10200 Vaquero TrlDec 15, 2023Disconnect/reconnect power for main distribution panel upgrade only. we are not upgrading the size of the service not upgrading the meter size · 134 m away
- 8402 Vaquero CvSep 14, 2026Install one customer-provided emporia pro smart home ev charger with emporia vue 3 home energy monitor install a dedicated 240v route conductors less than 5 feet from the exterior service equipment to the indicated garage wall location using code-compliant wiring methods · 141 m away
- 8500 Spicewood Mesa CvNov 10, 2026Upgrade of existing underground service to 120/240 volts 200 amp with current codes and standards · 144 m away
- 10120 Spicewood MesaJan 16, 2025Replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas · 147 m away
- 10306 Yucca DrFeb 10, 2026Replacement of complete existing central heat and air system with or without duct work · 160 m away