10405 Skyflower Dr
Austin, TX 78759
10405 Skyflower Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 10405 Skyflower Dr, Austin, TX 78759. The most recent, filed December 4, 2023, covers: “Upgrade panel from 200amp to 325amps”.
Compiled from City of Austin records · updated Dec 4, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 4, 2023
- since Dec 4, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade panel from 200amp to 325amps
- AppliedDec 4, 2023
- IssuedDec 4, 2023
- WorkDec '23 – Jul '24
- Final inspectionJul 24, 2024
Passed final inspection Jul 24, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade panel from 200amp to 325amps
Upgrade panel from 200amp to 325amps
City of Austin permitElectrical PermitFinal- Record
- 2023-154552 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10405 Skyflower Dr
What is being built at 10405 Skyflower Dr?
The latest filing (City of Austin permit 2023-154552 EP, December 4, 2023) covers upgrade panel from 200amp to 325amps.
How many permits and filings does 10405 Skyflower Dr have?
1 filing across 1 project, from December 4, 2023 to December 4, 2023.
Is there other construction near 10405 Skyflower Dr?
Yes. Nearby filings include 10409 Skyflower Dr (replacement of complete existing central heat and air system with or without duct work, Sep 9, 2024); 10301 Kirby Cv (30 tunnel to expose and repair separation of pipe on sewer branch line, Jul 23, 2024); 7313 Ellaview Ln (great hills section xxiii, amended plat of lot 14, block f, & sec 31, block a, l — great hills section xxiii, amended plat of lot 14, block f, & sec 31, block a, lots 16 & 17, Feb 5, 2009).
How do I get alerts for new permits at 10405 Skyflower Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10409 Skyflower DrSep 9, 2024Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 10301 Kirby CvJul 23, 202430 tunnel to expose and repair separation of pipe on sewer branch line · 75 m away
- 7313 Ellaview LnFeb 5, 2009Great hills section xxiii, amended plat of lot 14, block f, & sec 31, block a, l — great hills section xxiii, amended plat of lot 14, block f, & sec 31, block a, lots 16 & 17 · 86 m away
- 10303 Skyflower DrSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 97 m away
- 7220 Fabion DrJun 25, 2025Replacement of an existing water heater replaced natural gas water heater · 106 m away
- 7212 Fabion DrApr 17, 2026Replacement of an existing water heater replace 40-gallon gas water heater located: in walk-in attic · 112 m away
- 7221 Fabion DrMar 28, 2026Replacement of complete existing central heat and air system with or without duct work upstairs hvac system replacement. no ducts replaced · 118 m away
- 7305 Shasta CvOct 22, 2026Replacement of an existing water heater 50 gallon natural gas water heater correction · 120 m away
- 7303 Shasta CvJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 125 m away
- 10300 Kirby CvNov 22, 2023Replacement of an existing water heater · 132 m away
- 7300 Ellaview LnAug 8, 2025Installation of an ev charger in the garage · 146 m away
- 10302 Kirby CvOct 6, 2025Replacement of complete existing central heat and air system with or without duct work · 150 m away