Central heat and air system replacement at 10302 Kirby Cv
A replacement of the existing central heat and air system was permitted at 10302 Kirby Cv on October 6, 2025. The City of Austin permit record says duct work may or may not be included; the permit is final.
Summarized from City of Austin records · updated Oct 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 6, 2025
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 26, 2025
- IssuedOct 6, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 29, 2025
Passed final inspection Oct 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-122854 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10302 Kirby Cv
What is being built at 10302 Kirby Cv in Austin?
A City of Austin permit records replacement of the existing central heat and air system, with or without duct work.
When was the HVAC permit filed for 10302 Kirby Cv?
The permit was filed on October 6, 2025. Its number is 2025-122854 MP.
What type of permit was issued for 10302 Kirby Cv?
The City of Austin issued a mechanical permit, number 2025-122854 MP, for replacing the existing central heat and air system.
Is 10302 Kirby Cv a new construction project?
The permit describes replacement of an existing central heat and air system, not new construction.
What is the status of the permit at 10302 Kirby Cv?
The City of Austin permit record lists permit 2025-122854 MP as final.
Also being built nearby
All of 78759- 10300 Kirby CvNov 22, 2023Replacement of an existing water heater · 27 m away
- 7407 Blue Beach CvApr 3, 2026Not pre-plumbed water softener install. no electrical work will be done · 41 m away
- 7408 Skyflower CvOct 16, 2024Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 10301 Kirby CvJul 23, 202430 tunnel to expose and repair separation of pipe on sewer branch line · 82 m away
- 10303 Skyflower DrSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 95 m away
- 7405 Skyflower CvApr 24, 202516 zones irrigation · 103 m away
- 7400 Blue Beach CvAug 6, 2026(pandit sushainz) - installation of circuit for elec. vehicle charging station - esip · 105 m away
- 7503 Blue Beach CvNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 7402 Blue Beach CvSep 3, 2025Install evse · 111 m away
- 7305 Shasta CvOct 22, 2026Replacement of an existing water heater 50 gallon natural gas water heater correction · 117 m away
- 10216 Skyflower DrJun 17, 2024Install level 2 ev charger · 119 m away
- 10301 Nolina CvAug 6, 2026Natural gas water heater replacement and repair separation at the main sewer cleanout; removing the defective drain piping replacing it with new schedule 40 dwv pvc pipe and fittings · 133 m away