7408 Skyflower Cv
Austin, TX 78759
7408 Skyflower Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 7408 Skyflower Cv, Austin, TX 78759. The most recent, filed October 16, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Oct 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2024
- since Oct 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 10, 2024
- IssuedOct 16, 2024
- !WorkOct '24 – Apr '25
- Final inspection
Marked expired Apr 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-137136 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7408 Skyflower Cv
What is being built at 7408 Skyflower Cv?
The latest filing (City of Austin permit 2024-137136 MP, October 16, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7408 Skyflower Cv have?
1 filing across 1 project, from October 16, 2024 to October 16, 2024.
Is there other construction near 7408 Skyflower Cv?
Yes. Nearby filings include 10300 Kirby Cv (replacement of an existing water heater, Nov 22, 2023); 10216 Skyflower Dr (install level 2 ev charger, Jun 17, 2024); 7405 Skyflower Cv (16 zones irrigation, Apr 24, 2025).
How do I get alerts for new permits at 7408 Skyflower Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10300 Kirby CvNov 22, 2023Replacement of an existing water heater · 53 m away
- 10216 Skyflower DrJun 17, 2024Install level 2 ev charger · 56 m away
- 7405 Skyflower CvApr 24, 202516 zones irrigation · 66 m away
- 10302 Kirby CvOct 6, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 10303 Skyflower DrSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 74 m away
- 7407 Blue Beach CvApr 3, 2026Not pre-plumbed water softener install. no electrical work will be done · 102 m away
- 10301 Nolina CvAug 6, 2026Natural gas water heater replacement and repair separation at the main sewer cleanout; removing the defective drain piping replacing it with new schedule 40 dwv pvc pipe and fittings · 108 m away
- 7503 Blue Beach CvNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 10301 Kirby CvJul 23, 202430 tunnel to expose and repair separation of pipe on sewer branch line · 121 m away
- 10204 Skyflower DrAug 27, 2024Replacing water heater with a gas tankless repiping the homes water line · 124 m away
- 10300 Nolina CvNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 10200 Skyflower DrMar 20, 2025Replacement of complete existing central heat and air system with or without duct work attic access is through a pull down ladder inside the hallway on the left side of the house · 147 m away