groundranger
Recent · latest filing Aug 2026Residential

7400 Blue Beach Cv

Austin, TX 78759

EV charging circuit permitted at 7400 Blue Beach Cv

An electrical permit indicates a circuit for an electric vehicle charging station at 7400 Blue Beach Cv. The City of Austin permit, 2026-097744 EP, was filed August 6, 2026. A separate permit filed in 2023 covered replacement of the existing central heating and air system.

Summarized from City of Austin records · updated Aug 6, 2026

Projects
2
2 filings
Latest filing
Aug 6, 2026
since Aug 6, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

(pandit sushainz) - installation of circuit for elec. vehicle charging station - esip

  1. AppliedJul 28, 2026
  2. IssuedAug 6, 2026
  3. WorkAug '26 – Feb '27
  4. Final inspectionAug 20, 2026

Passed final inspection Aug 20, 2026.

1 contact on this project

Permit & project history

2 projects
  1. (pandit sushainz) - installation of circuit for elec. vehicle charging station - esip

    (pandit sushainz) - installation of circuit for elec. vehicle charging station - esip

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7400 Blue Beach Cv

What is being built at 7400 Blue Beach Cv?

A City of Austin electrical permit indicates installation of a circuit for an electric vehicle charging station. It does not specify additional details about the station.

When was the EV charging circuit permitted at 7400 Blue Beach Cv?

Permit 2026-097744 EP was filed August 6, 2026, and is marked final.

Is a new house being built at 7400 Blue Beach Cv?

The records listed here show an EV charging circuit permit and a permit for replacing the existing central heating and air system; they do not list a new-home construction permit.

What other work was permitted at 7400 Blue Beach Cv?

A mechanical permit, 2023-100975 MP, was filed August 9, 2023, for replacement of the existing central heat and air system, with or without duct work.

Is the EV charging station already installed at 7400 Blue Beach Cv?

The permit description is for installation of a circuit for an EV charging station and the permit is marked final. The record does not separately confirm the station's installation.

Also being built nearby

All of 78759
Email me when a new permit is filed