7400 Blue Beach Cv
Austin, TX 78759
EV charging circuit permitted at 7400 Blue Beach Cv
An electrical permit indicates a circuit for an electric vehicle charging station at 7400 Blue Beach Cv. The City of Austin permit, 2026-097744 EP, was filed August 6, 2026. A separate permit filed in 2023 covered replacement of the existing central heating and air system.
Summarized from City of Austin records · updated Aug 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 6, 2026
- since Aug 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(pandit sushainz) - installation of circuit for elec. vehicle charging station - esip
- AppliedJul 28, 2026
- IssuedAug 6, 2026
- WorkAug '26 – Feb '27
- Final inspectionAug 20, 2026
Passed final inspection Aug 20, 2026.
1 contact on this project
Permit & project history
2 projects(pandit sushainz) - installation of circuit for elec. vehicle charging station - esip
(pandit sushainz) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-097744 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-100975 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7400 Blue Beach Cv
What is being built at 7400 Blue Beach Cv?
A City of Austin electrical permit indicates installation of a circuit for an electric vehicle charging station. It does not specify additional details about the station.
When was the EV charging circuit permitted at 7400 Blue Beach Cv?
Permit 2026-097744 EP was filed August 6, 2026, and is marked final.
Is a new house being built at 7400 Blue Beach Cv?
The records listed here show an EV charging circuit permit and a permit for replacing the existing central heating and air system; they do not list a new-home construction permit.
What other work was permitted at 7400 Blue Beach Cv?
A mechanical permit, 2023-100975 MP, was filed August 9, 2023, for replacement of the existing central heat and air system, with or without duct work.
Is the EV charging station already installed at 7400 Blue Beach Cv?
The permit description is for installation of a circuit for an EV charging station and the permit is marked final. The record does not separately confirm the station's installation.
Also being built nearby
All of 78759- 7402 Blue Beach CvSep 3, 2025Install evse · 25 m away
- 7407 Blue Beach CvApr 3, 2026Not pre-plumbed water softener install. no electrical work will be done · 73 m away
- 7503 Canna CvMay 27, 2025Express: remove + replace (2) existing windows like for like. no remodel · 81 m away
- 7305 Shasta CvOct 22, 2026Replacement of an existing water heater 50 gallon natural gas water heater correction · 102 m away
- 10302 Kirby CvOct 6, 2025Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 7303 Shasta CvJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 119 m away
- 10600 Skyflower DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 10300 Kirby CvNov 22, 2023Replacement of an existing water heater · 130 m away
- 10511 Skyflower DrApr 22, 2026Replacement of an existing water heater 50gal gas tank located in the garage · 131 m away
- 10301 Kirby CvJul 23, 202430 tunnel to expose and repair separation of pipe on sewer branch line · 133 m away
- 7503 Blue Beach CvNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 10404 Cassia DrDec 8, 2025Replacement of complete existing central heat and air system with or without duct work **heat pump not gas · 147 m away