10621 Oak View Dr
Austin, TX 78759
Sewer line repair and water heater replacements at Austin home
Permits indicate sewer line repair and replacement of existing water heaters at 10621 Oak View Dr. The City of Austin issued permits for this work between February 20 and August 18, 2026.
Summarized from City of Austin records · updated Aug 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 18, 2026
- since Feb 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under home up to 20 to expose and repair broken main sewer line under home. tunnel access will be located in front of home
- AppliedAug 7, 2026
- IssuedAug 18, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 24, 2026
Passed final inspection Sep 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsTunnel under home up to 20 to expose and repair broken main sewer line under home. tunnel access will be located in front of home
Tunnel under home up to 20 to expose and repair broken main sewer line under home. tunnel access will be located in front of home
City of Austin permitPlumbing PermitFinal- Record
- 2026-102674 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater navien 240a2 tankless water heater located: in walk-in attic
Replacement of an existing water heater navien 240a2 tankless water heater located: in walk-in attic
City of Austin permitPlumbing PermitFinal- Record
- 2026-045477 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2026-020187 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10621 Oak View Dr
What work is permitted at 10621 Oak View Dr?
City of Austin permits cover a tunnel under the home to access and repair a broken sewer main, plus replacement of existing water heaters. The permits were filed from February 20 through August 18, 2026.
Is there sewer work happening at 10621 Oak View Dr?
Yes. Permit 2026-102674 PP, dated August 18, 2026, describes tunneling under the home to expose and repair a broken sewer main.
Are water heaters being replaced at this Austin address?
Yes. Permits dated February 20 and April 17, 2026, cover replacement of existing water heaters. The April permit specifies a Navien 240A2 tankless unit in a walk-in attic.
When was the latest permit filed for 10621 Oak View Dr?
The latest listed filing is permit 2026-102674 PP, dated August 18, 2026, for sewer line access and repair.
What are the permit numbers for work at 10621 Oak View Dr?
The listed permits are 2026-020187 PP, filed February 20, 2026; 2026-045477 PP, filed April 17, 2026; and 2026-102674 PP, filed August 18, 2026.
Also being built nearby
All of 78759- 10620 Oak View DrJul 18, 2025Dig up and replace water line from house to street only. install new home owner valve and prv on main water line · 56 m away
- 7603 Baja CvAug 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas two stage · 103 m away
- 7434 Fireoak DrMay 20, 2025Express: replacing 8 windows · 106 m away
- 7438 Fireoak DrJun 26, 2025Install gas line- run 22 of 1 poly trenched to generator · 110 m away
- 10604 Oak View DrJun 18, 2025Install level 2 ev charger · 112 m away
- 10601 Oak View DrMay 6, 2026Replacement of an existing water heater we will be going over replacing the water heater in the upstairs attic with a new pan thermal expansion tank shut off valve and removal of the old unit · 125 m away
- 7428 Fireoak DrAug 5, 2025Install gas line for generator with 1.25 black iron pipe mounted · 131 m away
- 11100 Blackmoor DrApr 25, 2025Replacement of an existing water heater 50 gallon natural gas water heater replacement · 140 m away
- 11125 Henge DrOct 29, 2024Irrigation and backflow · 145 m away
- 11106 Blackmoor DrDec 9, 2025Upgrade existing overhead electrical service · 160 m away
- 11108 Blackmoor DrApr 21, 2026My customer wants to upgrade the main electrical panel. the actual panel doesnt have a main breaker. i will use 2/0 copper thhn for the installation · 177 m away
- 11112 Henge DrSep 2, 2026Addition to single-story sfr · 178 m away