7603 Baja Cv
Austin, TX 78759
Two HVAC system replacements permitted at 7603 Baja Cv
City of Austin records show two like-for-like replacements of existing central heating and air systems at this residential address. The permits were filed May 7, 2025, and August 4, 2026; the later permit describes a 3-ton horizontal gas system.
Summarized from City of Austin records · updated Aug 4, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 4, 2026
- since May 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas two stage
- AppliedJul 24, 2026
- IssuedAug 4, 2026
- WorkAug '26 – Jan '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas two stage
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas two stage
City of Austin permitMechanical PermitActive- Record
- 2026-096056 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas unit
Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas unit
City of Austin permitMechanical PermitFinal- Record
- 2025-052559 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7603 Baja Cv
What is happening at 7603 Baja Cv?
City of Austin permits indicate replacements of existing central heating and air systems, rather than a new building project. The records are permit 2025-052559 MP and permit 2026-096056 MP.
Is a new home being built at 7603 Baja Cv?
The records provided show two mechanical permits for like-for-like HVAC system replacements. They do not list a new home construction permit.
When were the HVAC permits filed?
The first permit, 2025-052559 MP, was filed May 7, 2025. The second, 2026-096056 MP, was filed August 4, 2026.
What kind of heating and air system is being replaced?
The August 2026 permit describes a 3-ton horizontal gas system, with or without duct work. The May 2025 permit describes a 5-ton horizontal gas unit.
Are the HVAC permits active?
Permit 2026-096056 MP is listed as active. Permit 2025-052559 MP is listed as final.
What is the project cost for 7603 Baja Cv?
The records provided do not report a project cost or permit valuation.
Also being built nearby
All of 78759- 10621 Oak View DrAug 18, 2026Tunnel under home up to 20 to expose and repair broken main sewer line under home. tunnel access will be located in front of home · 103 m away
- 7438 Fireoak DrJun 26, 2025Install gas line- run 22 of 1 poly trenched to generator · 125 m away
- 7434 Fireoak DrMay 20, 2025Express: replacing 8 windows · 149 m away
- 10601 Oak View DrMay 6, 2026Replacement of an existing water heater we will be going over replacing the water heater in the upstairs attic with a new pan thermal expansion tank shut off valve and removal of the old unit · 153 m away
- 10620 Oak View DrJul 18, 2025Dig up and replace water line from house to street only. install new home owner valve and prv on main water line · 159 m away
- 10604 Oak View DrJun 18, 2025Install level 2 ev charger · 172 m away
- 10723 Cassia DrJun 9, 2025Install evse · 185 m away
- 7428 Fireoak DrAug 5, 2025Install gas line for generator with 1.25 black iron pipe mounted · 192 m away
- 10719 Cassia DrFeb 9, 2025Install new gas line for generator · 201 m away
- 7602 Bellflower CvSep 10, 2024Express: uninstall existing 1 window and replace with 1 new window of same size and operation; like for like install 3 at dining bay per renter in home · 203 m away
- 10900 Sage Oak CvMar 4, 2026Run 18 of 1 poly in trench to generator · 205 m away
- 7511 Fireoak DrOct 6, 2025Request to disconnect. replacing existing main electric panel with new main electric panel including new 150a main breaker. existing meter can to remain in place. no meter work being done. includes installation of a level 2 ev charger in attached garage · 206 m away