6502 Skinner Cv
Austin, TX 78759
Backup battery system and meter socket permitted at 6502 Skinner Cv
An electrical permit at 6502 Skinner Cv covers installing a backup battery system and an additional meter socket. The City of Austin issued the permit on September 29, 2026; its status is Final.
Summarized from City of Austin records · updated Sep 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2026
- since Sep 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket
- AppliedSep 15, 2026
- IssuedSep 29, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 21, 2026
Passed final inspection Oct 21, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-121372 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6502 Skinner Cv
What is being installed at 6502 Skinner Cv in Austin?
A City of Austin electrical permit covers a backup battery system and an additional meter socket. The permit was filed September 29, 2026.
Is there a permit for a battery system at 6502 Skinner Cv?
Yes. Permit 2026-121372 EP covers installation of a backup battery system and an additional meter socket.
When was the electrical permit filed for 6502 Skinner Cv?
The City of Austin permit was filed on September 29, 2026.
What is the status of permit 2026-121372 EP?
The City of Austin record lists permit 2026-121372 EP as Final.
Is a new building being built at 6502 Skinner Cv?
The record provided is for an electrical permit covering a backup battery system and an additional meter socket. It does not describe construction of a new building.
Also being built nearby
All of 78759- 6504 Skinner CvJan 29, 2026New uncovered wood deck addition (695 sq ft counted @ 50% impervious) revision to update structural plans approved 10/7/26 · 38 m away
- 6605 Rain Creek PkwyApr 14, 2026Express: remove and replace 13 windows like for like · 45 m away
- 6607 Rain Creek PkwyJul 14, 2026Express: install cement stucco system over exterior brick veneer on the front elevation only. existing veneer brick to remain in place · 62 m away
- 6501 Skinner CvNov 3, 2026Interior remodel - remodel 3 bathrooms remodel laundry room rolling in expired permit 2025-035956 bp scope - roof replacement new metal roof · 68 m away
- 6541 Lost Horizon DrDec 25, 2024Install new gas line for generator · 70 m away
- 10411 Charette CvJun 11, 2026Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 10413 Charette CvJan 6, 2026Replacement of an existing water heater · 88 m away
- 6523 Lost Horizon DrMay 7, 2024Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can not replaced - no espa · 93 m away
- 6530 Lost Horizon DrJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 101 m away
- 10419 Charette CvMay 5, 2026Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 6507 Rain Creek PkwyDec 6, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 10408 Charette CvMay 21, 2026Trenched out side and tied onto existing main 1 1/4 pvc line in yard. trenched across to front of garage on side of home and drive way. ran new 1 pex water line into garage into floor case between second floor. ran all new pex water lines to every single fixture in home. for second floor of home ran water lines up chase in wall to second story attic dropped water lines from attic. at each toilet and lavatory since we installed new quarter turn emergency shut off valves new stainless water supply lines and chrome trim rings. installed new washer machine box and ice maker box. also installed two lines for out door spigots and installed new hose bibs. and new 3/4 stainless water supply lines with shut off valve on water heater. all new water lines were strapped and secured. after all work was completed performed pressure test on new system and insured pressure test held and no leaks were present at the time of completion. 10408 charette cove austin tx 78759 · 131 m away