8600 Tallwood Dr
Austin, TX 78759
Water heater replacement permitted at 8600 Tallwood Dr
A permit covers replacement of an existing 50-gallon electric water heater at 8600 Tallwood Dr in Austin. The City of Austin issued the plumbing permit on September 21, 2026; its status is Final.
Summarized from City of Austin records · updated Sep 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 21, 2026
- since Sep 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replace 50 gallon electric water heater
- AppliedSep 18, 2026
- IssuedSep 21, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 1, 2026
Passed final inspection Oct 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater replace 50 gallon electric water heater
Replacement of an existing water heater replace 50 gallon electric water heater
City of Austin permitPlumbing PermitFinal- Record
- 2026-123101 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8600 Tallwood Dr
What is happening at 8600 Tallwood Dr in Austin?
A City of Austin plumbing permit covers replacing an existing 50-gallon electric water heater. The permit, 2026-123101 PP, was filed September 21, 2026.
Is new construction planned at 8600 Tallwood Dr?
The listed permit is for replacing an existing water heater, not for new construction. It was issued as a plumbing permit on September 21, 2026.
What kind of water heater is being installed at 8600 Tallwood Dr?
The permit description specifies a replacement 50-gallon electric water heater.
When was the water heater permit filed at 8600 Tallwood Dr?
The City of Austin permit was filed on September 21, 2026. Its permit number is 2026-123101 PP.
Is 8600 Tallwood Dr near Hill Elementary School?
Yes. The address is about 13 meters from Hill Elementary School at 8601 Tallwood Drive.
Also being built nearby
All of 78759- 8601 Tallwood Drive · Austin Independent School DistrictApr 27, 2026Hill elementary school — renovation/alteration — the scope of work is a new secure vestibule within the existing building. this includes converting a storage closet into a reception office with a connection to the new secure vestibule created by adding a wall and double doors at an existing entran · 13 m away
- 8504 Tallwood DrOct 15, 2026Repair and replace gas yard line and test · 52 m away
- 3901 Amy CirMar 14, 2024Express: replace 6 windows like for like · 57 m away
- 8608 Tallwood DrNov 11, 2024Minor gas repair/installation under 3 ft · 63 m away
- 8601 Tallwood DrOct 21, 2026Aisd - hill es phased modernization · 66 m away
- 8609 Tallwood DrJan 22, 2026Interior remodel - bathroom and kitchen will be updated and non support walls will be removed. replace existing doors and windows like for like. electrical and plumbing will be updated and brought to code. living and dining room walls will be removed and support beam approved by a licensed engineer. new hvac will be installed · 68 m away
- 8502 Tallwood DrSep 28, 2026(tarlecki adam) - installation of circuit for elec. vehicle charging station - esip · 75 m away
- 3905 Amy CirJun 28, 2024Interior remodel to expand existing bathroom the bathroom remodel/expansion will convert part of the existing garage- new tankless water heater new windows and door/window replacement · 81 m away
- 8610 Tallwood DrDec 28, 2023Replacing mast from winter storm · 83 m away
- 3904 Amy CirMar 14, 2025Request to disconnect service upgrade of 125amp overhead service to a 200amp · 109 m away
- 3908 Austin Woods DrAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 8404 Tallwood DrDec 26, 2024Replacement of complete existing central heat and air system with or without duct work replace 3 ton gas system with new basic seer2 goodman. new gsxn4 condenser coil and gm9s furnace on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 120 m away