8608 Tallwood Dr
Austin, TX 78759
8608 Tallwood Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8608 Tallwood Dr, Austin, TX 78759 since December 28, 2023. The most recent, filed November 11, 2024, covers: “Minor gas repair/installation under 3 ft”.
Compiled from City of Austin records · updated Nov 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 11, 2024
- since Dec 28, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMinor gas repair/installation under 3 ft
- AppliedOct 30, 2024
- IssuedNov 11, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 12, 2024
Passed final inspection Nov 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsMinor gas repair/installation under 3 ft
Minor gas repair/installation under 3 ft
City of Austin permitPlumbing PermitFinal- Record
- 2024-145619 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel below the fouundation to repair drain lines. trench thru yard to repair sewer line
Tunnel below the fouundation to repair drain lines. trench thru yard to repair sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2023-153987 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8608 Tallwood Dr
What is being built at 8608 Tallwood Dr?
The latest filing (City of Austin permit 2024-145619 PP, November 11, 2024) covers minor gas repair/installation under 3 ft.
How many permits and filings does 8608 Tallwood Dr have?
2 filings across 2 projects, from December 28, 2023 to November 11, 2024.
What is being built near Austin Independent School District in Austin?
8608 Tallwood Dr is about 69 m from Austin Independent School District (8601 Tallwood Drive). Its latest filing is for minor gas repair/installation under 3 ft.
Is there other construction near 8608 Tallwood Dr?
Yes. Nearby filings include 8610 Tallwood Dr (replacing mast from winter storm, Dec 28, 2023); 8609 Tallwood Dr (interior remodel - bathroom and kitchen will be updated and non support walls will be removed. replace existing doors and windows like for like. electrical and plumbing will be updated and brought to code. living and dining room walls will be removed and support beam approved by a licensed engineer. new hvac will be installed, Jan 22, 2026); 8600 Tallwood Dr (replacement of an existing water heater replace 50 gallon electric water heater, Sep 21, 2026).
How do I get alerts for new permits at 8608 Tallwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8610 Tallwood DrDec 28, 2023Replacing mast from winter storm · 24 m away
- 8609 Tallwood DrJan 22, 2026Interior remodel - bathroom and kitchen will be updated and non support walls will be removed. replace existing doors and windows like for like. electrical and plumbing will be updated and brought to code. living and dining room walls will be removed and support beam approved by a licensed engineer. new hvac will be installed · 60 m away
- 8600 Tallwood DrSep 21, 2026Replacement of an existing water heater replace 50 gallon electric water heater · 63 m away
- 4003 Greenhill PlSep 10, 2026Base: installing a backup battery system and additional meter socket · 65 m away
- 8601 Tallwood Drive · Austin Independent School DistrictApr 27, 2026Hill elementary school — renovation/alteration — the scope of work is a new secure vestibule within the existing building. this includes converting a storage closet into a reception office with a connection to the new secure vestibule created by adding a wall and double doors at an existing entran · 69 m away
- 8614 Tallwood DrOct 17, 2024Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc · 71 m away
- 3908 Austin Woods DrAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 3901 Amy CirMar 14, 2024Express: replace 6 windows like for like · 92 m away
- 3905 Hyridge DrJul 15, 2024Express remove & replace 1 window like for like · 97 m away
- 8601 Tallwood DrOct 21, 2026Aisd - hill es phased modernization · 106 m away
- 8504 Tallwood DrOct 15, 2026Repair and replace gas yard line and test · 109 m away
- 4005 Hyridge DrNov 5, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2-3) access holes on the front right and left sides of the house · 128 m away