8805 Silverarrow Cir
Austin, TX 78759
8805 Silverarrow Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 8805 Silverarrow Cir, Austin, TX 78759. The most recent, filed April 3, 2024, covers: “Replace all drain lines by way of tunneling and replacing sewer yard line”.
Compiled from City of Austin records · updated Apr 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 3, 2024
- since Apr 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace all drain lines by way of tunneling and replacing sewer yard line
- AppliedMar 25, 2024
- IssuedApr 3, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 16, 2024
Passed final inspection Apr 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace all drain lines by way of tunneling and replacing sewer yard line
Replace all drain lines by way of tunneling and replacing sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2024-037288 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8805 Silverarrow Cir
What is being built at 8805 Silverarrow Cir?
The latest filing (City of Austin permit 2024-037288 PP, April 3, 2024) covers replace all drain lines by way of tunneling and replacing sewer yard line.
How many permits and filings does 8805 Silverarrow Cir have?
1 filing across 1 project, from April 3, 2024 to April 3, 2024.
Is there other construction near 8805 Silverarrow Cir?
Yes. Nearby filings include 8809 Silverarrow Cir (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house, May 17, 2026); 8805 Silverhill Cv (additional 10 panels 4.1 kw to existing solar install, Oct 17, 2025); 8802 Silverarrow Cir (replacement of complete existing central heat and air system with or without duct work, Mar 4, 2026).
How do I get alerts for new permits at 8805 Silverarrow Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8809 Silverarrow CirMay 17, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 51 m away
- 8805 Silverhill CvOct 17, 2025Additional 10 panels 4.1 kw to existing solar install · 53 m away
- 8802 Silverarrow CirMar 4, 2026Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 8806 Silverhill CvSep 16, 2024Replacement of an existing water heater · 91 m away
- 8824 Honeysuckle TrlApr 10, 2024Express: new kitchen cabinets keep the same layout new flooring new countertop new baseboards new trim remove all popcorn texture from walls and ceilings new sanded texture paint all interior wood and walls new epoxy flooring · 94 m away
- 8724 Tallwood DrMar 11, 2024Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 8814 Honeysuckle TrlJul 9, 2025Interior remodel to kitchen and 2 bathrooms adding to existing covered patio updating electric breaker panel · 107 m away
- 8814 Silverarrow CirMar 14, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 110 m away
- 3901 Silverspring DrApr 4, 2025Express: tub shower combination to tub shower combination not moving plumbing not changing layout all work done in the wet area for plumbing. electrical will be changing out light fixture to can lights and also adding a light switch · 110 m away
- 8819 Silverarrow CirDec 7, 2023Install irrigation system · 110 m away
- 8726 Tallwood DrJun 30, 2026Install homebuilders loop ref: 2026-039967-bp · 118 m away
- 8806 Honeysuckle TrlMar 2, 2007Westover villas drainage improvements · 129 m away