groundranger
Historic · latest filing Dec 2023Residential

8819 Silverarrow Cir

Austin, TX 78759

8819 Silverarrow Cir: 2 projects on record

City of Austin lists 2 filings across 2 projects at 8819 Silverarrow Cir, Austin, TX 78759. The most recent, filed December 7, 2023, covers: “Install irrigation system”.

Compiled from City of Austin records · updated Dec 7, 2023

Projects
2
2 filings
Latest filing
Dec 7, 2023
since Dec 7, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install irrigation system

  1. AppliedOct 10, 2022
  2. IssuedDec 7, 2023
  3. WorkDec '23 – Dec '23
  4. Final inspectionDec 28, 2023

Passed final inspection Dec 28, 2023.

Permit & project history

2 projects
  1. Install irrigation system

    Install irrigation system

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Expedited review - *partial demolition* addition to existing 1-story sfr to increase to a 2-story sfr. interior remodel includes bedroom bathroom closet utility study and mud rooms. covered front porch. total [4bed 4.5bath]

    Expedited review - *partial demolition* addition to existing 1-story sfr to increase to a 2-story sfr. interior remodel includes bedroom bathroom closet utility study and mud rooms. covered front porch. total [4bed 4.5bath]

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8819 Silverarrow Cir

What is being built at 8819 Silverarrow Cir?

The latest filing (City of Austin permit 2023-156206 PP, December 7, 2023) covers install irrigation system.

How many permits and filings does 8819 Silverarrow Cir have?

2 filings across 2 projects, from December 7, 2023 to December 7, 2023.

Is there other construction near 8819 Silverarrow Cir?

Yes. Nearby filings include 8806 Silverhill Cv (replacement of an existing water heater, Sep 16, 2024); 8827 Silverarrow Cir (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house, Apr 15, 2026); 8809 Silverarrow Cir (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house, May 17, 2026).

How do I get alerts for new permits at 8819 Silverarrow Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78759
Email me when a new permit is filed