9019 Spicebrush Dr
Austin, TX 78759
Underground water line replacement permitted at 9019 Spicebrush Dr
An underground water line replacement of up to 55 feet was permitted at 9019 Spicebrush Dr on February 3, 2026. The City of Austin permit describes excavation, replacement with PVC or PEX piping, and backfill.
Summarized from City of Austin records · updated Feb 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUnderground pvc or pex water line replacement up to 1 pipe upto 55ft. includes excavation replacement of line using pvc or pex piping and back fill upto 55ft. permitting not included. not responsible for landscaping will do our best to [put everything back however with water leaks there may be some restoration needed beyond the typical scope of work
- AppliedJan 28, 2026
- IssuedFeb 3, 2026
- WorkFeb '26 – Feb '26
- Final inspectionFeb 9, 2026
Passed final inspection Feb 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUnderground pvc or pex water line replacement up to 1 pipe upto 55ft. includes excavation replacement of line using pvc or pex piping and back fill upto 55ft. permitting not included. not responsible for landscaping will do our best to [put everything back however with water leaks there may be some restoration needed beyond the typical scope of work
Underground pvc or pex water line replacement up to 1 pipe upto 55ft. includes excavation replacement of line using pvc or pex piping and back fill upto 55ft. permitting not included. not responsible for landscaping will do our best to [put everything back however with water leaks there may be some restoration needed beyond the typical scope of work
City of Austin permitPlumbing PermitFinal- Record
- 2026-010543 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9019 Spicebrush Dr
What work is permitted at 9019 Spicebrush Dr?
A City of Austin plumbing permit covers underground water line replacement of up to 55 feet, including excavation, replacement piping, and backfill.
When was the water line replacement permitted?
The permit was filed on February 3, 2026. Its status is listed as Final.
What materials will be used for the replacement water line?
The permit description allows PVC or PEX piping.
How long is the water line being replaced at 9019 Spicebrush Dr?
The permit describes replacement of up to 55 feet of underground water line.
What is the permit number for work at 9019 Spicebrush Dr?
The City of Austin plumbing permit number is 2026-010543 PP, filed February 3, 2026.
Also being built nearby
All of 78759- 6003 Satsuma CvMar 13, 2024Replacement of an existing water heater · 48 m away
- 9101 Spicebrush DrJan 12, 2026Replace existing 200a meter can with new 200a meter can. replace existing 200a panel with new 200a panel · 64 m away
- 9013 Spicebrush DrJan 14, 2026Express: remove and replace 14 windows (like for like) · 85 m away
- 6000 Ironwood CvMar 6, 2024Replacement of condenser only entire system replaced per owner · 103 m away
- 9008 Spicebrush DrMay 20, 2024Remove tankless water heater and tank type water heater and replace them with new ones · 109 m away
- 9011 Spicebrush DrJan 23, 2025Request to disconnect. replace main breaker box like for like. meter can is already 200 amps. no meter can work. install evse · 112 m away
- 9009-1/2 Spicebrush DrSep 11, 2024Northwest area lift station improvements great hills lift station no.53 · 156 m away
- 6105 Anemone CvNov 18, 2026Remodeling the downstairs which includes the kitchen dining room and laundry room. there is a couple of structural walls that will be removed. relocating kitchen sink range and fridge locations as noted on the plans. replacing 3 new windows. moving electrical outlets adding a vent a hood to exterior wall propane line reconfiguring for range. laundry making it more open functional with a pocket door and cabinets. new flooring throughout home new paint interior and exterior · 164 m away
- 6101 Anemone CvJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 9003 Clithea CvApr 28, 2025Replacement of complete existing central heat and air system with or without duct work · 173 m away
- 6109 Anemone CvJul 27, 2026Install level 2 ev charger · 188 m away
- 5802 Ginre CvJul 16, 2026Replacement of an existing water heater replacement of existing electrical water heater like for like · 197 m away