9101 Spicebrush Dr
Austin, TX 78759
Austin home permits cover electrical, gas and EV-charger work
City of Austin permits indicate upgrades at the existing residence at 9101 Spicebrush Dr, including an EV-charger circuit, a gas-system conversion and replacement of the electrical meter can and panel. The filings were dated Jan. 13, 2025, Sept. 9, 2025, and Jan. 12, 2026, respectively.
Summarized from City of Austin records · updated Jan 12, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 12, 2026
- since Jan 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace existing 200a meter can with new 200a meter can. replace existing 200a panel with new 200a panel
- AppliedJan 7, 2026
- IssuedJan 12, 2026
- WorkJan '26 – Jun '26
- Final inspectionJun 8, 2026
Passed final inspection Jun 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplace existing 200a meter can with new 200a meter can. replace existing 200a panel with new 200a panel
Replace existing 200a meter can with new 200a meter can. replace existing 200a panel with new 200a panel
City of Austin permitElectrical PermitFinal- Record
- 2026-002050 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Pressure test gas system to convert to natural gas
Pressure test gas system to convert to natural gas
City of Austin permitPlumbing PermitFinal- Record
- 2025-112971 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
(kotson michael) - installation of circuit for elec. vehicle charging station - esip
(kotson michael) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2024-167806 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9101 Spicebrush Dr
What work is planned at 9101 Spicebrush Dr in Austin?
City of Austin permits describe an EV-charger circuit, a gas-system pressure test to convert to natural gas, and replacement of the existing 200-amp meter can and panel.
Is a new home being built at 9101 Spicebrush Dr?
The permits listed for this address describe electrical and plumbing work at an existing residence, not construction of a new home.
When were permits filed for work at 9101 Spicebrush Dr?
The filings are dated Jan. 13, 2025, Sept. 9, 2025, and Jan. 12, 2026.
Is an EV charger being installed at 9101 Spicebrush Dr?
A City of Austin electrical permit dated Jan. 13, 2025, describes installation of a circuit for an electric vehicle charging station.
Is the home at 9101 Spicebrush Dr switching to natural gas?
A plumbing permit dated Sept. 9, 2025, describes pressure-testing the gas system to convert to natural gas.
What electrical work was permitted at 9101 Spicebrush Dr in 2026?
Permit 2026-002050 EP, dated Jan. 12, 2026, covers replacing the existing 200-amp meter can and 200-amp electrical panel. Its status is listed as Final.
Also being built nearby
All of 78759- 6000 Ironwood CvMar 6, 2024Replacement of condenser only entire system replaced per owner · 43 m away
- 9019 Spicebrush DrFeb 3, 2026Underground pvc or pex water line replacement up to 1 pipe upto 55ft. includes excavation replacement of line using pvc or pex piping and back fill upto 55ft. permitting not included. not responsible for landscaping will do our best to [put everything back however with water leaks there may be some restoration needed beyond the typical scope of work · 64 m away
- 6003 Satsuma CvMar 13, 2024Replacement of an existing water heater · 79 m away
- 9008 Spicebrush DrMay 20, 2024Remove tankless water heater and tank type water heater and replace them with new ones · 79 m away
- 6105 Anemone CvNov 18, 2026Remodeling the downstairs which includes the kitchen dining room and laundry room. there is a couple of structural walls that will be removed. relocating kitchen sink range and fridge locations as noted on the plans. replacing 3 new windows. moving electrical outlets adding a vent a hood to exterior wall propane line reconfiguring for range. laundry making it more open functional with a pocket door and cabinets. new flooring throughout home new paint interior and exterior · 101 m away
- 6101 Anemone CvJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 9013 Spicebrush DrJan 14, 2026Express: remove and replace 14 windows (like for like) · 118 m away
- 6109 Anemone CvJul 27, 2026Install level 2 ev charger · 131 m away
- 9003 Clithea CvApr 28, 2025Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 9011 Spicebrush DrJan 23, 2025Request to disconnect. replace main breaker box like for like. meter can is already 200 amps. no meter can work. install evse · 135 m away
- 6100 Anemone CvNov 22, 2024Electrical service upgrade (lasher heather) & installation of circuit for elec. vehicle charging station · 164 m away
- 6102 Anemone CvNov 21, 2024Water heater change out to residence · 167 m away