9508 Jollyville Rd
Austin, TX 78759
9508 Jollyville Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 9508 Jollyville Rd, Austin, TX 78759. The most recent, filed March 2, 2007, covers: “Upgrade to equipment on existing t-mobile cell tower”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade to equipment on existing t-mobile cell tower
- AppliedJan 7, 2022
- IssuedJul 18, 2023
- WorkJul '23 – Jul '23
- Final inspectionJul 19, 2023
Passed final inspection Jul 19, 2023.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsUpgrade to equipment on existing t-mobile cell tower
Upgrade to equipment on existing t-mobile cell tower
City of Austin permitBuilding PermitFinal- Record
- 2022-013687 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9508 Jollyville Rd
What is being built at 9508 Jollyville Rd?
The latest filing (City of Austin permit 2022-013687 BP, July 18, 2023) covers upgrade to equipment on existing t-mobile cell tower.
How many permits and filings does 9508 Jollyville Rd have?
2 filings across 2 projects, from March 2, 2007 to March 2, 2007.
What is being built near Grace Covenant Church in Austin?
9508 Jollyville Rd is about 191 m from Grace Covenant Church (9431 Jollyville Rd). Its latest filing is for upgrade to equipment on existing t-mobile cell tower.
Is there other construction near 9508 Jollyville Rd?
Yes. Nearby filings include 9500 Research Blvd Svrd (grace covenant church, Dec 13, 2018); 9431 Jollyville Rd (grace learning center building "c" — new construction — new construction of a four-story, approx. 48,000 sq ft worship assembly building for grace covenant church. includes a skybridge connection to and associated alterations of existing building d, plus site work, Oct 23, 2026); 9525 N Capital Of Texas Hwy Nb (replacement of complete existing central heat and air system with or without duct work, Oct 6, 2026).
How do I get alerts for new permits at 9508 Jollyville Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 9500 Research Blvd SvrdDec 13, 2018Grace covenant church · 165 m away
- 9431 Jollyville Rd · Grace Covenant ChurchOct 23, 2026Grace learning center building "c" — new construction — new construction of a four-story, approx. 48,000 sq ft worship assembly building for grace covenant church. includes a skybridge connection to and associated alterations of existing building d, plus site work · 191 m away
- 9525 N Capital Of Texas Hwy NbOct 6, 2026Replacement of complete existing central heat and air system with or without duct work · 193 m away
- 9106 Rockcrest CirNov 25, 2024We will be rebuilding the service for a duplex unit that is not up to code that had fallen down in a storm. the service looks to be 200a spiced at the weather head splitting it to two 100a services per each duplex. once we rebuild the service we will be moving this splice to a wire gutter mounted on the wall above the two meter cans. we will be also replacing the meter bases and 100a panels · 212 m away
- 9400 Jollyville RdMar 2, 2007Grace covenant church · 217 m away
- 9824-1/2 Research Blvd SvrdJan 21, 202248 waterline relocation · 252 m away
- 9310-1/2 Jollyville RdJun 20, 2019Grace covenant church off-site parking lot - phase two (with r sp-2017-0093dt) · 259 m away
- 9100 Rockcrest CirJan 9, 2024*request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect · 261 m away
- 9101 Rockcrest CirMay 25, 2024Replace sewer yard line from house connection to city tap · 269 m away
- 4104 Bluffridge DrMay 6, 2024Replace sewer yard line from house connection to city tap · 272 m away
- 4002 Bluffridge CirDec 12, 2024Interior remodel including kitchen and bathroom upgrades and modifications to primary bathroom. plumbing and electrical layout modifications · 274 m away
- 4110 Bluffridge DrSep 18, 2026Replacement of complete existing central heat and air system with or without duct work · 285 m away