4400 S Mlk Jr. Pkwy
Baytown, TX 77705 · Lamar University
Gentry Hall Building 8 stair and lobby renovation
A renovation of existing space for Gentry Hall Building 8 at 4400 S M.L.K. Jr. Parkway includes stair and lobby repairs. The project was registered with the Texas Department of Licensing and Regulation on December 12, 2025; the applicant’s estimated project cost is $190,000.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 12, 2025
- since Dec 12, 2025
- Largest scope
- 800 sf
- Estimated cost
- $190K
- state registration
Where this project stands
Inspected · closing outGentry Hall - Building 8 Stair & Lobby Repair
800 sq ft · $190K est.
- RegisteredDec 12, 2025
- Plan review
- ConstructionDec '25 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of existing space — lamar university
TDLR project registrationRenovation/AlterationInspection Complete800 sq ft$190K est.- Project #
- TABS2026007905
- Tenant / owner
- Gentry Hall - Building 8 Stair & Lobby Repair
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4400 S Mlk Jr. Pkwy
What is being built at 4400 S M.L.K. Jr. Parkway?
The TDLR registration describes a renovation of existing space at Gentry Hall Building 8, specifically stair and lobby repairs. It is not listed as new construction.
Is Gentry Hall Building 8 getting renovated?
Yes. A TDLR project registration dated December 12, 2025, lists stair and lobby repairs at Building 8.
When was the Gentry Hall Building 8 project filed?
The project was registered on December 12, 2025. Its TDLR project number is TABS2026007905.
How much will the Gentry Hall Building 8 renovation cost?
The applicant’s TDLR estimate for the project is $190,000. This is an estimate, not a confirmed final cost.
How large is the Gentry Hall Building 8 renovation?
The TDLR registration lists 800 square feet for the renovation.
Is the Gentry Hall Building 8 project complete?
The TDLR record lists the project status as “Inspection Complete.”
Also being built nearby
All of 77705- 4400 S Martin Luther King Jr Pkwy · Lamar UniversityMar 27, 2024Chemistry building facade renovation — renovation/alteration — replace brick veneer and curtainwall system
- 4400 S. M L King Jr Pkwy · Lamar UniversitySep 30, 2025Galloway leadership studies lab — renovation/alteration — renovation of a classroom
- 4400 S. M.l. King Jr. Parkway, Beaumont, Tx, 77710 · Lamar UniversityNov 7, 2024Lamar university mary and john gray library renovation — renovation/alteration — renovation of the existing 8-story mary and john gray library at lamar university. total square footage is 161,781
- 4410 Mlk Blvd · Lamar UniversityDec 13, 2024Combs hall lounge — renovation/alteration — construction of new student lounges · 11 m away
- 4655 Rolfe Christopher Dr · Lamar University Engineering AnnexOct 14, 2024Lamar university engineering annex — renovation/alteration — 3600 sq ft interior renovation of exiting building into office and student spaces. limited site work including restriping of parking lot and limited exterior work to replace existing windows with new windows at existing wall · 316 m away
- 4401 S. Mlk Jr. Parkway · Lamar UniversityDec 11, 2024Lamar university president's suite expansion — renovation/alteration — renovation to existing presidents suite in existing auditorium. scope of work is to add 1600 sq ft of additional area to suite including a bar , a storage room and a viewing platform · 448 m away
- 796 E Virginia St · Lamar UniversityApr 4, 2024Brooks-shivers dining hall renovation — renovation/alteration — interior renovation of an existing dining hall. the scope consists of new finishes, new lighting, re-installation of existing kitchen equipment as noted, and upgrades to electrical as needed for new lighting · 539 m away
- 795 Colorado Ave · Lamar UniversitySep 26, 2024Lamar university - combs hall office renovation — renovation/alteration — interior demolition and build back of walls, doors, plumbing, electrical, mechanical, and finishes · 574 m away