4400 S. M L King Jr Pkwy
Beaumont, TX 77710 · Galloway Leadership Studies Lab, Lamar University Registration Suite Renovation
Two Lamar University renovations registered at 4400 S. MLK Jr. Pkwy
Two interior renovation projects are registered at this multi-tenant Lamar University site: a classroom renovation and a registration suite conversion. The projects were filed with TDLR on May 23 and September 30, 2025; both are listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 30, 2025
- since May 23, 2025
- Largest scope
- 1,370 sf
- Estimated cost
- $400K
- state registration
Where this project stands
CompletedGalloway Leadership Studies Lab
1,370 sq ft · $400K est.
- RegisteredSep 30, 2025
- Plan review
- ConstructionOct '25 – Jan '26
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsRenovation of a classroom — lamar university
TDLR project registrationRenovation/AlterationProject Closed1,370 sq ft$400K est.- Project #
- TABS2026002163
- Tenant / owner
- Galloway Leadership Studies Lab
- Design firm
- Pro
- Contact
- Pro
Conversion of existing conference room into a registration suite. finishes replacement in current registrar's office. — wimberly building
TDLR project registrationRenovation/AlterationProject Closed1,200 sq ft$150K est.- Project #
- TABS2025019726
- Tenant / owner
- Lamar University Registration Suite Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4400 S. M L King Jr Pkwy
What is being built at 4400 S. M L King Jr. Pkwy in Beaumont?
TDLR records list two renovations at this multi-tenant site: a classroom renovation for the Galloway Leadership Studies Lab and a registration suite renovation.
When were the Lamar University renovations filed?
The registration suite project was filed May 23, 2025, and the Galloway Leadership Studies Lab project was filed September 30, 2025. Both TDLR records list the projects as closed.
What is the registration suite renovation at Lamar University?
The project converts an existing conference room into a registration suite and replaces finishes in the current registrar's office. TDLR project number TABS2025019726 was filed May 23, 2025.
Is a classroom being renovated at Lamar University?
Yes. TDLR records describe a 1,370-square-foot classroom renovation for the Galloway Leadership Studies Lab, filed September 30, 2025, under project number TABS2026002163.
What is being renovated near Lamar University Engineering Annex?
The records at 4400 S. M L King Jr. Pkwy list a classroom renovation and a registration suite renovation. The Lamar University Engineering Annex is listed about 316 meters away.
Also being built nearby
All of 77710- 4400 S Martin Luther King Jr Pkwy · Lamar UniversityMar 27, 2024Chemistry building facade renovation — renovation/alteration — replace brick veneer and curtainwall system
- 4400 S Mlk Jr. Pkwy · Lamar UniversityDec 12, 2025Gentry hall - building 8 stair & lobby repair — renovation/alteration — renovation of existing space
- 4400 S. M.l. King Jr. Parkway, Beaumont, Tx, 77710 · Lamar UniversityNov 7, 2024Lamar university mary and john gray library renovation — renovation/alteration — renovation of the existing 8-story mary and john gray library at lamar university. total square footage is 161,781
- 4410 Mlk Blvd · Lamar UniversityDec 13, 2024Combs hall lounge — renovation/alteration — construction of new student lounges · 11 m away
- 4655 Rolfe Christopher Dr · Lamar University Engineering AnnexOct 14, 2024Lamar university engineering annex — renovation/alteration — 3600 sq ft interior renovation of exiting building into office and student spaces. limited site work including restriping of parking lot and limited exterior work to replace existing windows with new windows at existing wall · 316 m away
- 4401 S. Mlk Jr. Parkway · Lamar UniversityDec 11, 2024Lamar university president's suite expansion — renovation/alteration — renovation to existing presidents suite in existing auditorium. scope of work is to add 1600 sq ft of additional area to suite including a bar , a storage room and a viewing platform · 448 m away
- 796 E Virginia St · Lamar UniversityApr 4, 2024Brooks-shivers dining hall renovation — renovation/alteration — interior renovation of an existing dining hall. the scope consists of new finishes, new lighting, re-installation of existing kitchen equipment as noted, and upgrades to electrical as needed for new lighting · 539 m away
- 795 Colorado Ave · Lamar UniversitySep 26, 2024Lamar university - combs hall office renovation — renovation/alteration — interior demolition and build back of walls, doors, plumbing, electrical, mechanical, and finishes · 574 m away