11404 Musket Rim
Bee Cave, TX 78738
66 roof-mounted solar panels and Tesla energy storage
An Austin electrical permit filed November 5, 2025, lists 66 roof-mounted Peimar 450-watt solar panels and a Tesla energy storage system for a guest house and barn at this address. A later permit, filed August 13, 2026, covers moving the utility meter about five feet because it did not have the required overhead clearance.
Summarized from City of Austin records · updated Aug 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 13, 2026
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWe will be moving the utility meter onto a rack about 5 away from current location due to the meter not having proper overhead clearance per code
- AppliedAug 6, 2026
- IssuedAug 13, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 25, 2026
Passed final inspection Sep 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsWe will be moving the utility meter onto a rack about 5 away from current location due to the meter not having proper overhead clearance per code
We will be moving the utility meter onto a rack about 5 away from current location due to the meter not having proper overhead clearance per code
City of Austin permitElectrical PermitFinal- Record
- 2026-102572 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
[elipps guest house/barn] 66 roof mounted peimar 450w solar panels with tesla ess system
[elipps guest house/barn] 66 roof mounted peimar 450w solar panels with tesla ess system
City of Austin permitElectrical PermitActive- Record
- 2025-137520 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11404 Musket Rim
What is being installed at 11404 Musket Rim?
An Austin electrical permit lists 66 roof-mounted Peimar 450-watt solar panels and a Tesla energy storage system for a guest house and barn. The permit is 2025-137520 EP, filed November 5, 2025.
Is there a solar installation planned at 11404 Musket Rim?
Yes. Permit 2025-137520 EP, filed November 5, 2025, describes 66 roof-mounted solar panels and a Tesla energy storage system.
How many solar panels are listed for 11404 Musket Rim?
The November 5, 2025, electrical permit lists 66 Peimar panels rated at 450 watts each.
What is the later electrical permit for at 11404 Musket Rim?
Permit 2026-102572 EP, filed August 13, 2026, covers moving the utility meter about five feet because it lacked proper overhead clearance.
When was the solar permit filed for 11404 Musket Rim?
The electrical permit for the solar panels and Tesla energy storage system was filed November 5, 2025. Its number is 2025-137520 EP.
Also being built nearby
All of 78738- 11408 Musket RimAug 13, 2026Need to upgrade the meter transocket and move utility meter · 99 m away
- 5005 Paraiso PkwyOct 16, 2026Base: installing a backup battery system and additional meter socket · 206 m away
- 4925 Celanova CtDec 7, 2023Install 26kw home standby generator disconnect / reconnect · 264 m away
- 11813 Musket RimOct 28, 2026Etj install new 4.251kw rooftop solar system for existing residential only · 424 m away
- 11724 Musket RimMar 24, 2026Request to disconnect installation of two generators and 1-200 amp transfer switch and 1-150 amp transfer switch. meter can remain and service provided by austin energy · 443 m away
- 11908 Musket RimMar 8, 2025Install/replace 200 amp main breaker panel and meter (underground) · 536 m away
- 4800 Mondonedo CvSep 22, 2026Install new roof-mounted solar system and energy storage system to existing single family residence. underground ae · 580 m away
More solar installs in 78738.