11408 Musket Rim
Bee Cave, TX 78738
Permit filed for 132 ground-mounted solar panels in Bee Cave
A City of Austin electrical permit filed November 12, 2025, describes 132 ground-mounted residential solar panels at 11408 Musket Rim. A second electrical permit, filed August 13, 2026, covers upgrading and relocating the utility meter; that permit is marked final.
Summarized from City of Austin records · updated Aug 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 13, 2026
- since Nov 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNeed to upgrade the meter transocket and move utility meter
- AppliedAug 6, 2026
- IssuedAug 13, 2026
- WorkAug '26 – Nov '26
- Final inspectionNov 3, 2026
Passed final inspection Nov 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNeed to upgrade the meter transocket and move utility meter
Need to upgrade the meter transocket and move utility meter
City of Austin permitElectrical PermitFinal- Record
- 2026-102560 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
[elipps main house] 132 ground-mounted residential trina vertex 620w panels
[elipps main house] 132 ground-mounted residential trina vertex 620w panels
City of Austin permitElectrical PermitActive- Record
- 2025-137515 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11408 Musket Rim
What is being built at 11408 Musket Rim?
A November 2025 electrical permit describes 132 ground-mounted residential solar panels. A separate permit covers an upgrade and relocation of the utility meter.
Is solar being installed at 11408 Musket Rim?
Yes. City of Austin permit 2025-137515 EP describes 132 ground-mounted residential Trina Vertex 620-watt panels. The permit is marked active.
When was the solar permit filed for 11408 Musket Rim?
Permit 2025-137515 EP was filed on November 12, 2025, and is marked active.
Why is there a utility meter permit at 11408 Musket Rim?
Permit 2026-102560 EP, filed August 13, 2026, describes upgrading the meter transocket and moving the utility meter. It is marked final.
How many solar panels are planned for 11408 Musket Rim?
The November 2025 electrical permit describes 132 ground-mounted panels.
Also being built nearby
All of 78738- 11404 Musket RimAug 13, 2026We will be moving the utility meter onto a rack about 5 away from current location due to the meter not having proper overhead clearance per code · 99 m away
- 5005 Paraiso PkwyOct 16, 2026Base: installing a backup battery system and additional meter socket · 284 m away
- 4925 Celanova CtDec 7, 2023Install 26kw home standby generator disconnect / reconnect · 329 m away
- 11724 Musket RimMar 24, 2026Request to disconnect installation of two generators and 1-200 amp transfer switch and 1-150 amp transfer switch. meter can remain and service provided by austin energy · 501 m away
- 11813 Musket RimOct 28, 2026Etj install new 4.251kw rooftop solar system for existing residential only · 510 m away
- 4800 Mondonedo CvSep 22, 2026Install new roof-mounted solar system and energy storage system to existing single family residence. underground ae · 570 m away