5100 Long Arrow Canyon
Bee Cave, TX 78738
44-kW ground-mounted solar installation in Bee Cave
A 44-kW ground-mounted solar installation is planned at 5100 Long Arrow Canyon outside city limits, according to an Austin electrical permit. The permit was filed December 19, 2025, and is listed as final; it references Austin Energy.
Summarized from City of Austin records · updated Dec 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2025
- since Dec 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled44kw ground mount solar install outside city limits with austin energy
- AppliedDec 15, 2025
- IssuedDec 19, 2025
- WorkDec '25 – Jun '26
- Final inspectionFeb 27, 2026
Passed final inspection Feb 27, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project44kw ground mount solar install outside city limits with austin energy
44kw ground mount solar install outside city limits with austin energy
City of Austin permitElectrical PermitFinal- Record
- 2025-158804 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5100 Long Arrow Canyon
What is being built at 5100 Long Arrow Canyon?
An Austin electrical permit describes a 44-kW ground-mounted solar installation outside city limits. The permit, 2025-158804 EP, was filed December 19, 2025, and is listed as final.
When was the solar permit filed at 5100 Long Arrow Canyon?
Permit 2025-158804 EP was filed on December 19, 2025. Its status is listed as final.
How large is the solar installation at 5100 Long Arrow Canyon?
The permit description specifies a 44-kW ground-mounted solar installation.
Is the solar project at 5100 Long Arrow Canyon inside Bee Cave city limits?
The permit description says the installation is outside city limits.
Does the 5100 Long Arrow Canyon permit mention Austin Energy?
Yes. The permit description says the 44-kW ground-mounted solar installation is with Austin Energy.
Also being built nearby
All of 78738- 5102 Long Arrow CanyonSep 9, 2024Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain · 64 m away
- 5000 High Canyon PassJun 3, 2024Request to disconnect. installing generator with ats using ae disconnect program · 204 m away
- 13508 Lone Rider TrlDec 3, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 406 m away
More solar installs in 78738.