groundranger
Historic · latest filing Sep 2024Residential

5102 Long Arrow Canyon

Bee Cave, TX 78738

5102 Long Arrow Canyon: 1 project on record

City of Austin lists 1 filing across 1 project at 5102 Long Arrow Canyon, Bee Cave, TX 78738. The most recent, filed September 9, 2024, covers: “Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain”.

Compiled from City of Austin records · updated Sep 9, 2024

Projects
1
1 filings
Latest filing
Sep 9, 2024
since Sep 9, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain

  1. AppliedSep 2, 2024
  2. IssuedSep 9, 2024
  3. WorkSep '24 – Oct '24
  4. Final inspectionOct 10, 2024

Passed final inspection Oct 10, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain

    Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5102 Long Arrow Canyon

What is being built at 5102 Long Arrow Canyon?

The latest filing (City of Austin permit 2024-111920 EP, September 9, 2024) covers request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain.

How many permits and filings does 5102 Long Arrow Canyon have?

1 filing across 1 project, from September 9, 2024 to September 9, 2024.

Is there other construction near 5102 Long Arrow Canyon?

Yes. Nearby filings include 5100 Long Arrow Canyon (44kw ground mount solar install outside city limits with austin energy, Dec 19, 2025); 5000 High Canyon Pass (request to disconnect. installing generator with ats using ae disconnect program, Jun 3, 2024); 13508 Lone Rider Trl (disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size, Dec 3, 2024).

How do I get alerts for new permits at 5102 Long Arrow Canyon?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78738
Email me when a new permit is filed