4909 Great Divide Dr
Bee Cave, TX 78738
4909 Great Divide Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4909 Great Divide Dr, Bee Cave, TX 78738. The most recent, filed January 22, 2025, covers: “Install new 12.325kw rooftop solar system for existing residential only”.
Compiled from City of Austin records · updated Jan 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2025
- since Jan 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 12.325kw rooftop solar system for existing residential only
- AppliedJan 15, 2025
- IssuedJan 22, 2025
- WorkJan '25 – Jul '25
- Final inspectionJun 12, 2025
Passed final inspection Jun 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new 12.325kw rooftop solar system for existing residential only
Install new 12.325kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-005467 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4909 Great Divide Dr
What is being built at 4909 Great Divide Dr?
The latest filing (City of Austin permit 2025-005467 EP, January 22, 2025) covers install new 12.325kw rooftop solar system for existing residential only.
How many permits and filings does 4909 Great Divide Dr have?
1 filing across 1 project, from January 22, 2025 to January 22, 2025.
Is there other construction near 4909 Great Divide Dr?
Yes. Nearby filings include 4816 Pecan Chase (new service in etj 600 amp service, Sep 20, 2024); 5017 Great Divide Dr (request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway, Mar 28, 2025); 5000 High Canyon Pass (request to disconnect. installing generator with ats using ae disconnect program, Jun 3, 2024).
How do I get alerts for new permits at 4909 Great Divide Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 4816 Pecan ChaseSep 20, 2024New service in etj 600 amp service · 186 m away
- 5017 Great Divide DrMar 28, 2025Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway · 304 m away
- 5000 High Canyon PassJun 3, 2024Request to disconnect. installing generator with ats using ae disconnect program · 417 m away
- 12913 Hacienda RidgeSep 17, 2024Temp loop for a new construction of a pool house located in etj · 453 m away
- 12821 Hacienda RidgeMar 1, 2024Installation of a generator and automatic transfer switch. requires a temporary disconnect · 474 m away
- 4713 Pecan ChaseMay 20, 2025Etj temp contruction loop ref · 482 m away
- 12920 Hacienda RidgeJul 21, 2026We will be installing 4 circuits to an existing sub-panel and replacing outlets and switches in a small utility room and replacing light fixtures in the same room. moving the dryer and washer to a new location in the same utility room. customer serviced by austin energy · 526 m away
- 12816 Hacienda RidgeJul 2, 2025Install new 10.320 kw rooftop solar system for existing residential only · 542 m away
- 12812 Hacienda RidgeNov 9, 2026Etj- shut off to replace main breaker · 582 m away
- 13508 Lone Rider TrlDec 3, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 592 m away
- 5102 Long Arrow CanyonSep 9, 2024Request to disconnect installation of 200 amp transfer switch on existing 200 amp meter and service and meter can to remain · 593 m away
More solar installs in 78738.