12812 Hacienda Ridge
Bee Cave, TX 78738
16 kW rooftop solar system and electrical work
Permits indicate a 16 kW roof-mounted solar system with energy storage at 12812 Hacienda Ridge, along with electrical work. The solar permit was filed September 30, 2026; later permits filed October 20 and November 9 cover a smart switch installation and main breaker replacement.
Summarized from City of Austin records · updated Nov 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 9, 2026
- since Sep 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEtj- shut off to replace main breaker
- AppliedNov 4, 2026
- IssuedNov 9, 2026
- WorkNov '26 – Nov '26
- Final inspectionNov 13, 2026
Passed final inspection Nov 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsEtj- shut off to replace main breaker
Etj- shut off to replace main breaker
City of Austin permitElectrical PermitFinal- Record
- 2026-145466 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Etj - install smart switch mid between utility meter and main service panel
Etj - install smart switch mid between utility meter and main service panel
City of Austin permitElectrical PermitFinal- Record
- 2026-136359 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Etj. 16 kw roof mounted solar with energy storage
Etj. 16 kw roof mounted solar with energy storage
City of Austin permitElectrical PermitActive- Record
- 2026-119907 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12812 Hacienda Ridge
What is being built at 12812 Hacienda Ridge?
Permits indicate a 16 kW roof-mounted solar system with energy storage, plus electrical work at the address. The records do not describe a new building.
Is solar being installed at 12812 Hacienda Ridge?
Yes. City of Austin permit 2026-119907 EP, filed September 30, 2026, describes a 16 kW roof-mounted solar installation with energy storage. Its status is Active.
What electrical work is planned at 12812 Hacienda Ridge?
Permits describe installing a smart switch between the utility meter and main service panel, and replacing the main breaker. The records show both permits as Final.
When were permits filed for 12812 Hacienda Ridge?
The earliest listed permit was filed September 30, 2026, for rooftop solar and energy storage. Later electrical permits were filed October 20 and November 9, 2026.
What is permit 2026-119907 EP for in Bee Cave?
The City of Austin permit describes a 16 kW roof-mounted solar system with energy storage at 12812 Hacienda Ridge. It was filed September 30, 2026, and is listed as Active.
Is a new home being built at 12812 Hacienda Ridge?
The listed permits describe solar installation and electrical work, not construction of a new home.
Also being built nearby
All of 78738- 12816 Hacienda RidgeJul 2, 2025Install new 10.320 kw rooftop solar system for existing residential only · 43 m away
- 12821 Hacienda RidgeMar 1, 2024Installation of a generator and automatic transfer switch. requires a temporary disconnect · 114 m away
- 12913 Hacienda RidgeSep 17, 2024Temp loop for a new construction of a pool house located in etj · 191 m away
- 12920 Hacienda RidgeJul 21, 2026We will be installing 4 circuits to an existing sub-panel and replacing outlets and switches in a small utility room and replacing light fixtures in the same room. moving the dryer and washer to a new location in the same utility room. customer serviced by austin energy · 292 m away
- 5017 Great Divide DrMar 28, 2025Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway · 306 m away
- 4816 Pecan ChaseSep 20, 2024New service in etj 600 amp service · 464 m away
- 4713 Pecan ChaseMay 20, 2025Etj temp contruction loop ref · 465 m away
- 5304 Great Divide DrFeb 17, 2025Build overhead 350 amp single phase electrical service on a rack · 502 m away
- 12624 Side Oats DrFeb 5, 2025Etj new service for sfr · 510 m away
- 5308 Great Divide DrSep 3, 2026200amp panel meter base and riser replacement adding grounding rods and surge protection. austin electric in the electrical provider · 525 m away
- 4909 Great Divide DrJan 22, 2025Install new 12.325kw rooftop solar system for existing residential only · 582 m away
- 12621 Grama CvNov 14, 2024Request to disconnect installing standby 48kw generator and installing ats · 584 m away
More warehouses & industrial in 78738, solar installs in 78738.