5017 Great Divide Dr
Bee Cave, TX 78738
24.36-kW solar system and battery installation
Electrical permits indicate a 24.36-kW solar system with four Tesla Powerwall 3 batteries is being installed at 5017 Great Divide Dr. The solar permit was filed January 6, 2025, and marked final; a related electrical permit was marked final January 13. A March 28 permit request for a disconnect was marked expired.
Summarized from City of Austin records · updated Mar 28, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Mar 28, 2025
- since Jan 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredRequest to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway
- AppliedMar 25, 2025
- IssuedMar 28, 2025
- !WorkMar '25 – Mar '26
- Final inspection
Marked expired Mar 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsRequest to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway
Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway
City of Austin permitElectrical PermitExpired- Record
- 2025-035374 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway
Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway
City of Austin permitElectrical PermitFinal- Record
- 2025-002550 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing a 24.36 kw pv solar system 4 tesla pw 3 batteries and dg pv meter
Installing a 24.36 kw pv solar system 4 tesla pw 3 batteries and dg pv meter
City of Austin permitElectrical PermitFinal- Record
- 2024-159346 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5017 Great Divide Dr
What is being installed at 5017 Great Divide Dr?
City of Austin permit records describe a 24.36-kW solar system, four Tesla Powerwall 3 batteries and a distributed generation photovoltaic meter.
How large is the solar system at 5017 Great Divide Dr?
The permit description lists a 24.36-kW photovoltaic solar system. Permit 2024-159346 EP was filed January 6, 2025, and marked final.
Are batteries included with the solar installation at 5017 Great Divide Dr?
Yes. The permit description specifies four Tesla Powerwall 3 batteries and a 150-amp gateway.
When was the solar installation permitted at 5017 Great Divide Dr?
The solar permit, 2024-159346 EP, was filed January 6, 2025. A related electrical permit, 2025-002550 EP, was filed January 13 and marked final.
Is the solar project at 5017 Great Divide Dr complete?
The January 6 and January 13 electrical permits are marked final. A related disconnect request filed March 28, 2025, is marked expired; the records do not confirm whether all work is complete.
How much does the solar installation at 5017 Great Divide Dr cost?
The available permit records do not report a project valuation or total cost.
Also being built nearby
All of 78738- 12821 Hacienda RidgeMar 1, 2024Installation of a generator and automatic transfer switch. requires a temporary disconnect · 192 m away
- 12913 Hacienda RidgeSep 17, 2024Temp loop for a new construction of a pool house located in etj · 259 m away
- 4816 Pecan ChaseSep 20, 2024New service in etj 600 amp service · 267 m away
- 12816 Hacienda RidgeJul 2, 2025Install new 10.320 kw rooftop solar system for existing residential only · 273 m away
- 4909 Great Divide DrJan 22, 2025Install new 12.325kw rooftop solar system for existing residential only · 304 m away
- 12812 Hacienda RidgeNov 9, 2026Etj- shut off to replace main breaker · 306 m away
- 12920 Hacienda RidgeJul 21, 2026We will be installing 4 circuits to an existing sub-panel and replacing outlets and switches in a small utility room and replacing light fixtures in the same room. moving the dryer and washer to a new location in the same utility room. customer serviced by austin energy · 391 m away
- 4713 Pecan ChaseMay 20, 2025Etj temp contruction loop ref · 464 m away
- 5304 Great Divide DrFeb 17, 2025Build overhead 350 amp single phase electrical service on a rack · 489 m away
- 5308 Great Divide DrSep 3, 2026200amp panel meter base and riser replacement adding grounding rods and surge protection. austin electric in the electrical provider · 528 m away
- 5000 High Canyon PassJun 3, 2024Request to disconnect. installing generator with ats using ae disconnect program · 585 m away
More solar installs in 78738.