24.36-kW solar system and battery installation

Electrical permits indicate a 24.36-kW solar system with four Tesla Powerwall 3 batteries is being installed at 5017 Great Divide Dr. The solar permit was filed January 6, 2025, and marked final; a related electrical permit was marked final January 13. A March 28 permit request for a disconnect was marked expired.

Summarized from City of Austin records · updated Mar 28, 2025

Projects
3
3 filings
Latest filing
Mar 28, 2025
since Jan 6, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway

  1. AppliedMar 25, 2025
  2. IssuedMar 28, 2025
  3. !WorkMar '25 – Mar '26
  4. Final inspection

Marked expired Mar 24, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway

    Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway

    Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installing a 24.36 kw pv solar system 4 tesla pw 3 batteries and dg pv meter

    Installing a 24.36 kw pv solar system 4 tesla pw 3 batteries and dg pv meter

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5017 Great Divide Dr

What is being installed at 5017 Great Divide Dr?

City of Austin permit records describe a 24.36-kW solar system, four Tesla Powerwall 3 batteries and a distributed generation photovoltaic meter.

How large is the solar system at 5017 Great Divide Dr?

The permit description lists a 24.36-kW photovoltaic solar system. Permit 2024-159346 EP was filed January 6, 2025, and marked final.

Are batteries included with the solar installation at 5017 Great Divide Dr?

Yes. The permit description specifies four Tesla Powerwall 3 batteries and a 150-amp gateway.

When was the solar installation permitted at 5017 Great Divide Dr?

The solar permit, 2024-159346 EP, was filed January 6, 2025. A related electrical permit, 2025-002550 EP, was filed January 13 and marked final.

Is the solar project at 5017 Great Divide Dr complete?

The January 6 and January 13 electrical permits are marked final. A related disconnect request filed March 28, 2025, is marked expired; the records do not confirm whether all work is complete.

How much does the solar installation at 5017 Great Divide Dr cost?

The available permit records do not report a project valuation or total cost.

Also being built nearby

All of 78738

More solar installs in 78738.

Email me when a new permit is filed