206 West Villa Maria
Bryan, TX 77801 · City Of Bryan, Texas
Midtown Park sidewalk, dam and bridge project in Bryan
A 12-foot-wide sidewalk along a new dam and bridge is planned at Bryan Midtown Park. The TDLR project registration was filed July 9, 2026, and lists 36,000 square feet with an applicant-estimated cost of $910,000. Its status is listed as Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2026
- since Jul 9, 2026
- Largest scope
- 36,000 sf
- Estimated cost
- $910K
- state registration
Where this project stands
Inspected · closing outBryan Midtown Park-Ph3C-Contract 3
36,000 sq ft · $910K est.
- RegisteredJul 9, 2026
- Plan review
- ConstructionSep '25 – Oct '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 project12' wide sidewalk along a new dam with bridge at midtown park — city of bryan midtown park dam construction
TDLR project registrationNew ConstructionInspection Complete36,000 sq ft$910K est.- Project #
- TABS2026024926
- Tenant / owner
- Bryan Midtown Park-Ph3c-Contract 3
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 206 West Villa Maria
What is being built at 206 West Villa Maria in Bryan?
A project at Bryan Midtown Park includes a 12-foot-wide sidewalk along a new dam with a bridge. The TDLR registration, TABS2026024926, was filed July 9, 2026.
Is there a new sidewalk coming to Bryan Midtown Park?
The project description calls for a 12-foot-wide sidewalk along a new dam with a bridge. Its TDLR registration lists the status as Inspection Complete.
How much will the Midtown Park dam and bridge project cost?
The TDLR registration lists an applicant-estimated project cost of $910,000. That is an estimate, not a confirmed final cost.
How big is the Bryan Midtown Park project?
The TDLR registration lists the project at 36,000 square feet and describes a sidewalk along a new dam with a bridge.
What is being built near Midtown Park Restroom?
The Midtown Park project at 206 West Villa Maria includes a 12-foot-wide sidewalk along a new dam with a bridge. Midtown Park Restroom is listed at the same address as a nearby landmark.
Also being built nearby
All of 77801- 206 W. Villa Maria · City Of BryanOct 13, 2026Midtown park restroom — new construction — dk4: 269 sq ft / cortez building: 167 sq ft
- 206 West Villa Maria Road · City Of Bryan TexasNov 19, 2024City of bryan midtown boardwalk — new construction — steel sheet pile bulkhead, concrete retaining walls, concrete sidewalk, drainage structures, lighting, grading and vegetation
- 400 W Villa Maria Rd · Topgolf U.s.a. Inc.Jul 24, 2024Remodel of an existing golf entertainment facility — renovation/alteration — the removal of existing ball dispensers and hitting mats to be replaced with similar equipment. the installation of it equipment. the installation of hvac split systems. the installation of office equipment. total area of work = 22,851sf · 290 m away