206 West Villa Maria Road
Bryan, TX 77801 · City Of Bryan Texas
Midtown Boardwalk project registered in Bryan
The City of Bryan Midtown Boardwalk project is planned for 206 West Villa Maria Road in Bryan. A Texas Department of Licensing and Regulation registration filed November 19, 2024, describes a steel sheet pile bulkhead, concrete retaining walls and sidewalk, drainage structures, lighting, grading and vegetation at Midtown Park. The applicant’s estimated project cost is $4.25 million, and the registration lists the project as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 19, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2024
- since Nov 19, 2024
- Largest scope
- 217,800 sf
- Estimated cost
- $7.6M
- state registration
Where this project stands
Inspected · closing outCity of Bryan Midtown Boardwalk
217,800 sq ft · $4.3M est.
- RegisteredNov 19, 2024
- Plan review
- ConstructionJan '25 – Jul '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsSteel sheet pile bulkhead, concrete retaining walls, concrete sidewalk, drainage structures, lighting, grading and vegetation — city of bryan, midtown park
TDLR project registrationNew ConstructionInspection Complete217,800 sq ft$4.3M est.- Project #
- TABS2025005886
- Tenant / owner
- City Of Bryan Midtown Boardwalk
- Design firm
- Pro
- Contact
- Pro
New streets, sidewalks, parking lots, and infrastructure for drainage and lighting. — bryan midtown park, phase 8a
TDLR project registrationNew ConstructionProject Closed120,000 sq ft$7.6M est.- Project #
- TABS2023018066
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 206 West Villa Maria Road
What is being built at 206 West Villa Maria Road in Bryan?
A Texas Department of Licensing and Regulation registration describes the City of Bryan Midtown Boardwalk project at Midtown Park. It includes a bulkhead, concrete retaining walls and sidewalk, drainage structures, lighting, grading and vegetation.
When was the Midtown Boardwalk project permitted?
The TDLR project registration was filed November 19, 2024. It is listed as project TABS2025005886.
How much will the Bryan Midtown Boardwalk project cost?
The applicant’s estimated cost is $4.25 million, according to the TDLR registration. This is an estimate for the project, not a reported final cost.
Is the Midtown Boardwalk project complete?
The TDLR registration lists the project status as inspection complete.
What is being built near Topgolf on West Villa Maria Road?
The City of Bryan Midtown Boardwalk project is registered at 206 West Villa Maria Road, about 290 meters from Topgolf at 400 W Villa Maria Road.
What improvements are included in the Midtown Boardwalk project?
The registration lists a steel sheet pile bulkhead, concrete retaining walls, a concrete sidewalk, drainage structures, lighting, grading and vegetation.
Also being built nearby
All of 77801- 206 W. Villa Maria · City Of BryanOct 13, 2026Midtown park restroom — new construction — dk4: 269 sq ft / cortez building: 167 sq ft
- 206 West Villa Maria · City Of Bryan, TexasJul 9, 2026Bryan midtown park-ph3c-contract 3 — new construction — 12' wide sidewalk along a new dam with bridge at midtown park
- 400 W Villa Maria Rd · Topgolf U.s.a. Inc.Jul 24, 2024Remodel of an existing golf entertainment facility — renovation/alteration — the removal of existing ball dispensers and hitting mats to be replaced with similar equipment. the installation of it equipment. the installation of hvac split systems. the installation of office equipment. total area of work = 22,851sf · 290 m away