groundranger
Recent · latest filing May 2026Commercial

17565 SH 6 South

College Station, TX 77845 · Southern Pointe Section 800, Southern Pointe Subdivision Section 202

Southern Pointe Section 800 adds streets and sidewalks

Southern Pointe Section 800 is registered for new streets, sidewalks, curb ramps and crosswalks in a future right of way at 17565 SH 6 South in College Station. The Texas Department of Licensing and Regulation record was filed May 22, 2026, and lists the project status as Review Complete.

Summarized from Texas Department of Licensing and Regulation records · updated May 22, 2026

Projects
2
2 filings
Latest filing
May 22, 2026
since May 22, 2026
Largest scope
16,500 sf
Estimated cost
$185K
state registration

Where this project stands

Under construction

Southern Pointe Section 800

16,500 sq ft · $96K est.

  1. RegisteredMay 22, 2026
  2. Plan review
  3. ConstructionNov '26 – Apr '27
  4. Inspected
  5. Closed
11% through of a 6-month buildNov 1, 2026 → Apr 30, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. New sidewalks, curb ramps cross walks and streets in a future right of way — southern pointe subdivision

    TDLR project registrationNew ConstructionReview Complete16,500 sq ft$96K est.
    Tenant / owner
    Southern Pointe Section 800
    Design firm
    Pro
    Contact
    Pro
  2. Sidewalks, curb ramps, crosswalks and roadways — southern point subdivision

    TDLR project registrationNew ConstructionProject Closed35,675 sq ft$185K est.
    Tenant / owner
    Southern Pointe Subdivision Section 202
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 17565 SH 6 South

What is being built at 17565 SH 6 South in College Station?

A TDLR project registration describes new streets, sidewalks, curb ramps and crosswalks for Southern Pointe Section 800 in a future right of way.

When was the Southern Pointe Section 800 project filed?

The TDLR registration was filed May 22, 2026. The record lists the status as Review Complete.

Is Southern Pointe Section 800 a new building?

The registration describes street and pedestrian infrastructure, not a building: streets, sidewalks, curb ramps and crosswalks in a future right of way.

What is the estimated cost of the Southern Pointe Section 800 project?

The TDLR record lists an estimated project cost of $96,282.

How large is the Southern Pointe Section 800 project?

The TDLR registration lists the project area as 16,500 square feet.

Also being built nearby

All of 77845
Email me when it passes inspection