17565 SH 6 South
College Station, TX 77845 · Southern Pointe Section 800, Southern Pointe Subdivision Section 202
Southern Pointe Section 800 adds streets and sidewalks
Southern Pointe Section 800 is registered for new streets, sidewalks, curb ramps and crosswalks in a future right of way at 17565 SH 6 South in College Station. The Texas Department of Licensing and Regulation record was filed May 22, 2026, and lists the project status as Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated May 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 22, 2026
- since May 22, 2026
- Largest scope
- 16,500 sf
- Estimated cost
- $185K
- state registration
Where this project stands
Under constructionSouthern Pointe Section 800
16,500 sq ft · $96K est.
- RegisteredMay 22, 2026
- Plan review
- ConstructionNov '26 – Apr '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsNew sidewalks, curb ramps cross walks and streets in a future right of way — southern pointe subdivision
TDLR project registrationNew ConstructionReview Complete16,500 sq ft$96K est.- Project #
- TABS2026020990
- Tenant / owner
- Southern Pointe Section 800
- Design firm
- Pro
- Contact
- Pro
Sidewalks, curb ramps, crosswalks and roadways — southern point subdivision
TDLR project registrationNew ConstructionProject Closed35,675 sq ft$185K est.- Project #
- TABS2023013852
- Tenant / owner
- Southern Pointe Subdivision Section 202
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 17565 SH 6 South
What is being built at 17565 SH 6 South in College Station?
A TDLR project registration describes new streets, sidewalks, curb ramps and crosswalks for Southern Pointe Section 800 in a future right of way.
When was the Southern Pointe Section 800 project filed?
The TDLR registration was filed May 22, 2026. The record lists the status as Review Complete.
Is Southern Pointe Section 800 a new building?
The registration describes street and pedestrian infrastructure, not a building: streets, sidewalks, curb ramps and crosswalks in a future right of way.
What is the estimated cost of the Southern Pointe Section 800 project?
The TDLR record lists an estimated project cost of $96,282.
How large is the Southern Pointe Section 800 project?
The TDLR registration lists the project area as 16,500 square feet.
Also being built nearby
All of 77845- 17565 SH-6 S. TX Vickie, Shurata, Camden, Armory, & Kinney Streets · Tpg Ag Ehciii (len) Multi States 5, LLCJun 4, 2025Southern pointe subdivision section 503 — new construction — sidewalks, curb ramps, street crossings for a subdivision
- 17565 SH-6 South Peach Creek Cut Off At Mather Parkway · Phillips 3 Land Holdings, LLCAug 7, 2024Southern pointe subdivision section 109 — new construction — new sidewalks and curb ramps
- 17565 SH-6 South 16121 · Tpg Ag Ehc III (len) Multi State 5 LLCDec 4, 2024Southern pointe subdivision, section 600 — new construction — sidewalks and curb ramps
- 17565 SH 6 S TX El Doro, Wilksboro, Talladega, Roxie And Southern · Phillips 3 Land Holdings, LLCNov 22, 2024Southern pointe subdivision section 701 — new construction — new streets, sidewalks, curb ramps and street crossings
- 17565 SH-6 S. TX-16121 · Tpg Ag Ehc III (leh) Multi States 5, LLCAug 20, 2025Southern pointe subdivision, section 601 — new construction — new sidewalks, curb ramps, crosswalks and roadway
- 17565 SH-6 South At Mather, Watkins, Canton, Patri · Phillips 3 Land HoldingsJul 18, 2024Southern pointe section 203 — new construction — new sidewalks for a subdivision
- 17565 SH-6 TX-16121 · Bv Southern Pointe Dev, Inc.Sep 13, 2025Southern pointe subdivision section403b & 403 site improvements — new construction — sidewalks on a public way
- 17539 State Hwy 6 South · Bv Southern Pointe Development, Inc.Mar 9, 2024Southern pointe subdivision parkland — new construction — sidewalks for a future hoa community park and rec center · 175 m away
- 17529 State Highway 6 · Erie LLCMay 10, 2024Txb - market #75 southern pointe hwy 5 — new construction — gas station and convenient store · 243 m away