groundranger
Historic · latest filing Aug 2024Commercial

17565 SH-6 South Peach Creek Cut Off At Mather Parkway

College Station, TX 77845 · Phillips 3 Land Holdings, LLC

Sidewalks and curb ramps planned for Southern Pointe Section 109

New sidewalks and curb ramps for Southern Pointe Subdivision Section 109 were registered with the Texas Department of Licensing and Regulation on August 7, 2024. The project is listed as closed, with an applicant-estimated cost of $54,327.

Summarized from Texas Department of Licensing and Regulation records · updated Aug 7, 2024

Projects
1
1 filings
Latest filing
Aug 7, 2024
since Aug 7, 2024
Largest scope
10,890 sf
Estimated cost
$54K
state registration

Where this project stands

Completed

Southern Pointe Subdivision Section 109

10,890 sq ft · $54K est.

  1. RegisteredAug 7, 2024
  2. Plan review
  3. ConstructionAug '24 – Dec '24
  4. Inspected
  5. Closed

Ran as a 4-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New sidewalks and curb ramps. — southern pointe subdivision

    TDLR project registrationNew ConstructionProject Closed10,890 sq ft$54K est.
    Tenant / owner
    Southern Pointe Subdivision Section 109
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 17565 SH-6 South Peach Creek Cut Off At Mather Parkway

What is being built at 17565 SH-6 South in College Station?

A TDLR project registration describes new sidewalks and curb ramps for Southern Pointe Subdivision Section 109. It does not describe a building.

When was the Southern Pointe Section 109 project registered?

The TDLR registration, TABS2024024918, was dated August 7, 2024.

What work is included in Southern Pointe Section 109?

The registration lists new sidewalks and curb ramps. The project is marked closed.

How much will the Southern Pointe Section 109 work cost?

The applicant estimated the project cost at $54,327. This is an estimate for the project, not a reported total for development at the address.

Is a new building planned at 17565 SH-6 South?

The available registration describes sidewalks and curb ramps for Section 109, not construction of a building.

Are other Southern Pointe subdivision improvements recorded nearby?

Yes. Nearby records include sidewalk, curb ramp, street-crossing, and roadway work for other Southern Pointe sections, with filings dated from 2024 through 2026.

Also being built nearby

All of 77845
Get alerts for 17565 SH-6 South Peach Creek Cut Off At Mather Parkway