27310 Oak Ridge School Road
Conroe, TX 77385 · Conroe Independent School District
Oak Ridge ninth-grade campus renovations registered in Conroe
Renovations at Oak Ridge High School’s ninth-grade campus include MEP infrastructure upgrades, new floors, paint and ceilings, plus new welding, culinary and computer labs. The project was registered with the Texas Department of Licensing and Regulation on December 17, 2024, under project number TABS2025007845.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 17, 2024
- since Dec 17, 2024
- Largest scope
- 192,581 sf
- Estimated cost
- $19M
- state registration
Where this project stands
Finishing up · inspection nextOak Ridge High School Ninth Grade Campus Renovations
192,581 sq ft · $19M est.
- RegisteredDec 17, 2024
- Plan review
- ConstructionJun '25 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation work to include upgrades to mep infrastructure and new floors, paint, and ceilings. renovations to include new welding, culinary, and computer labs. — oak ridge high school ninth grade campus
TDLR project registrationRenovation/AlterationReview Complete192,581 sq ft$19M est.- Project #
- TABS2025007845
- Tenant / owner
- Oak Ridge High School Ninth Grade Campus Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 27310 Oak Ridge School Road
What is being built at 27310 Oak Ridge School Road?
The project is a renovation of Oak Ridge High School’s ninth-grade campus. The listed work includes MEP upgrades, new floors, paint and ceilings, and new welding, culinary and computer labs.
When was the Oak Ridge ninth-grade campus renovation registered?
The TDLR project registration was filed on December 17, 2024. Its project number is TABS2025007845.
What renovations are planned at Oak Ridge High School’s ninth-grade campus?
The registration describes MEP infrastructure upgrades, new floors, paint and ceilings, and new welding, culinary and computer labs.
How much will the Oak Ridge campus renovation cost?
The TDLR registration lists an estimated project cost of $19 million. This is the applicant’s estimate for the project.
How large is the Oak Ridge ninth-grade campus renovation?
The registered project covers 192,581 square feet.
Is the renovation near Conroe Independent School District?
Yes. The project address is about 14 meters from the nearby Conroe Independent School District location at 27330 Oak Ridge School Road.
When will the Oak Ridge campus renovations be finished?
The available TDLR record does not provide a completion date.
Also being built nearby
All of 77385- 27330 Oak Ridge School Road · Conroe Independent School DistrictFeb 7, 2025Oak ridge high school fine arts expansion — additions to existing building — addition of new classrooms and auditorium · 14 m away
- 1001 Medical Plaza Dr · Healthcare Realty Services INCApr 27, 2026Montgomery county periodontal assoc. — new construction — new construction for a periodontal office · 122 m away
- 1001 Medical Plaza Drive · Hr Acquisition Of San Antonio LtdJan 30, 2026The woodlands dental group dental designs by alisa reed — renovation/alteration — interior remodel · 122 m away
- 920 Medical Plaza Dr · Memorial Hermann Health SystemApr 3, 2024Mh tw2 suite 260 renovation — renovation/alteration — renovate existing clinic space for new tenant use · 156 m away
- 1111 Medical Plaza Dr · Hsre Pinemed Mob, LPApr 8, 2024Pinemed parking expansion — renovation/alteration — a parking lot renovation / addition and restriping of parking spaces · 366 m away
- 201 David J. Vetter Blvd · Woodlofts Shenandoah, Ltd.Apr 10, 2025Woodlofts — new construction — clubhouse and leasing space for multi-family property · 376 m away
- 19377 David Memorial DrJun 9, 2025David memorial building — new construction — a new 4 story buidling · 454 m away
- 9250 Pinecroft Drive · Memorial Hermann Hospital SystemFeb 19, 2026Memorial hermann woodlands rad meic — renovation/alteration — the project is on level 01 of memorial hermann woodlands hospital and includes replacing the existing radiology imaging equipment along with minor renovations such as finish updates and infrastructure modifications · 580 m away
- 9250 Pinecroft Dr · Memorial Hermann Hospital SystemJun 19, 2025Mhwmc south tower entrance renovation — renovation/alteration — the project consists of the renovation of the entry door into the memorial hermann hospital. the work will be done on the ground floor and is approximately 379 square feet. work will include site demolition and include related utilities as require · 580 m away
- 9305 Pinecroft · Memorial HermannAug 15, 2024Uspi pinecroft asc level 3 remodel — renovation/alteration — limited demolition and construction within an existing suite. new finishes include flooring, paint, and ceiling grid and tile in the open area · 582 m away