9250 Pinecroft Drive
The Woodlands, TX 77380 · Memorial Hermann Hospital System
Radiology equipment replacement at Memorial Hermann
A 320-square-foot project at Memorial Hermann The Woodlands Medical Center will replace existing radiology imaging equipment and make minor interior and infrastructure updates. The project was registered with TDLR on February 19, 2026, under project number TABS2026013040.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 19, 2026
- since Feb 19, 2026
- Largest scope
- 320 sf
- Estimated cost
- $160K
- state registration
Where this project stands
Inspected · closing outMemorial Hermann Woodlands Rad MEIC
320 sq ft · $160K est.
- RegisteredFeb 19, 2026
- Plan review
- ConstructionMar '26 – May '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project is on level 01 of memorial hermann woodlands hospital and includes replacing the existing radiology imaging equipment along with minor renovations such as finish updates and infrastructure modifications. — memorial hermann the woodlands medical center
TDLR project registrationRenovation/AlterationInspection Complete320 sq ft$160K est.- Project #
- TABS2026013040
- Tenant / owner
- Memorial Hermann Woodlands Rad Meic
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9250 Pinecroft Drive
What is being built at 9250 Pinecroft Drive?
The project replaces existing radiology imaging equipment on level 01 of Memorial Hermann The Woodlands Medical Center, with minor finish and infrastructure updates. It is a renovation, not a new building.
Is a new radiology facility opening at Memorial Hermann The Woodlands?
The TDLR registration describes replacement imaging equipment and minor renovations in the hospital’s existing radiology area. It does not describe a new facility opening.
When was the Memorial Hermann radiology project registered?
The project was registered on February 19, 2026. Its TDLR project number is TABS2026013040.
How much will the radiology renovation at 9250 Pinecroft Drive cost?
The TDLR registration lists an estimated project cost of $160,000. This is the applicant’s estimate, not a confirmed final cost.
How large is the Memorial Hermann imaging equipment project?
The registered project covers 320 square feet on level 01 of the hospital.
What is happening near Memorial Hermann Woodlands Opid Ct?
At 9250 Pinecroft Drive, the hospital is replacing existing radiology imaging equipment and making minor renovations. The project was registered with TDLR on February 19, 2026.
Also being built nearby
All of 77380- 9250 Pinecroft Dr · Memorial Hermann Hospital SystemJun 19, 2025Mhwmc south tower entrance renovation — renovation/alteration — the project consists of the renovation of the entry door into the memorial hermann hospital. the work will be done on the ground floor and is approximately 379 square feet. work will include site demolition and include related utilities as require
- 9200 Pinecroft · Memorial Hermann Health SystemApr 30, 2024Mh tw3 suite 130 renovation — renovation/alteration — provide petct exam room and support functions for an out-patient imaging clinic · 126 m away
- 9200 Pinecroft Drive · Hcp Ventures V, LLCJul 31, 2026Memorial hermann woodlands opid ct — renovation/alteration — the project is on level 01 of memorial hermann woodlands plaza 3, shenandoah, texas. the scope of this project includes the new equipment installation and replacement of finishes in an existing ct room · 126 m away
- 9200 Pinecroft Dr · Memorial Hermann Health SystemJun 17, 2024Mhwmc breast center finish upgrade — renovation/alteration — the project scope will include demolition, construction of new partitions, millwork, finishes, equipment and required supporting utilities · 126 m away
- 9305 Pinecroft · Memorial HermannAug 15, 2024Uspi pinecroft asc level 3 remodel — renovation/alteration — limited demolition and construction within an existing suite. new finishes include flooring, paint, and ceiling grid and tile in the open area · 146 m away
- 9191 Pinecroft Dr · Healthcare Realty TrustAug 6, 2025Spec suite 275 — renovation/alteration — a 2,043 sq ft tenant renovation finish out in pinecroft medical plaza within the woodlands · 154 m away
- 9180 Pinecroft Drive · Memorial Hermann Hospital SystemJun 26, 2026Memorial hermann medical group urology — renovation/alteration — first time buildout of an existing medical office lease space within an existing medical office building for a urology clinic · 176 m away
- 1111 Medical Plaza Dr · Hsre Pinemed Mob, LPApr 8, 2024Pinemed parking expansion — renovation/alteration — a parking lot renovation / addition and restriping of parking spaces · 250 m away
- 1501 Research Forest Dr · Raising Cane's Usa, LLCJul 8, 2025Raising cane's (c0263) — renovation/alteration — minor architectural updates at building. exterior canopies, lighting, finishes & furniture in public areas, restroom fixtures replacement at existing locations · 380 m away
- 8850 Six Pines Dr · Healthcare RealtyAug 1, 2024Modern smile center — new construction — interior build out of a dental office · 412 m away
- 8850 Six Pines · Healthcare Realty Services LLCJul 31, 2025Well infused — renovation/alteration — interior tenant improvement only, no exterior work · 412 m away
- 8850 Six Pines Drive · Hr Acquisition Of San Antonio LtdSep 17, 2025Aesthetic house expansion — renovation/alteration — commercial office interior remodel/expansion of space from 2163/sq ft to 4,263/sq ft · 412 m away