9200 Pinecroft
Shenandoah, TX 77380 · Mh Tw3 Suite 130 Renovation, Mh Tw3 Suite 140 Pharmacy
Imaging clinic and pharmacy renovations at 9200 Pinecroft
Two suites in the multi-tenant Medical Plaza 3 at 9200 Pinecroft were registered for renovation: a clinic-to-pharmacy conversion filed December 6, 2023, and an outpatient imaging clinic renovation filed April 30, 2024. The imaging project includes a PET/CT exam room and support spaces. Both TDLR registrations are listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 30, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 30, 2024
- since Apr 30, 2024
- Largest scope
- 2,619 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
CompletedMH TW3 Suite 130 Renovation
2,619 sq ft · $1.4M est.
- RegisteredApr 30, 2024
- Plan review
- ConstructionJun '24 – Nov '24
- Inspected
- Closed
Ran as a 6-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsProvide petct exam room and support functions for an out-patient imaging clinic. — memorial hermann the woodlands, medical plaza 3
TDLR project registrationRenovation/AlterationProject Closed2,619 sq ft$1.4M est.- Project #
- TABS2024017377
- Tenant / owner
- Mh Tw3 Suite 130 Renovation
- Design firm
- Pro
- Contact
- Pro
Renovating a clinic into a retail pharmacy space. — medical plaza 3
TDLR project registrationRenovation/AlterationProject Closed1,061 sq ft$734K est.- Project #
- TABS2024006769
- Tenant / owner
- Mh Tw3 Suite 140 Pharmacy
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9200 Pinecroft
What is being built at 9200 Pinecroft in Shenandoah?
Two Medical Plaza 3 suites were registered for renovation: one for a retail pharmacy and one for an outpatient imaging clinic with a PET/CT exam room. The registrations describe work within existing suites, not a new building.
Is a new pharmacy opening at 9200 Pinecroft?
A TDLR registration filed December 6, 2023, describes renovating a clinic into a retail pharmacy space in Suite 140. The record does not state whether or when the pharmacy will open.
What is the PET/CT project at Medical Plaza 3?
The Suite 130 renovation includes a PET/CT exam room and support functions for an outpatient imaging clinic. It was registered April 30, 2024, under TABS2024017377.
What's being renovated near Memorial Hermann Health System in Shenandoah?
At 9200 Pinecroft, a Suite 130 imaging clinic renovation and a Suite 140 pharmacy conversion were registered for work in Medical Plaza 3. The imaging project was filed April 30, 2024, and the pharmacy project December 6, 2023.
Is 9200 Pinecroft a multi-tenant building?
Yes. The records describe separate renovation projects in Suites 130 and 140 of Medical Plaza 3, so the work applies to individual suites rather than the whole address.
When were the 9200 Pinecroft renovations permitted?
The TDLR registration for the Suite 140 pharmacy conversion was filed December 6, 2023; the Suite 130 imaging clinic renovation was filed April 30, 2024. Both records are marked as closed.
Also being built nearby
All of 77380- 9200 Pinecroft Dr · Memorial Hermann Health SystemJun 17, 2024Mhwmc breast center finish upgrade — renovation/alteration — the project scope will include demolition, construction of new partitions, millwork, finishes, equipment and required supporting utilities
- 9200 Pinecroft Drive · Hcp Ventures V, LLCJul 31, 2026Memorial hermann woodlands opid ct — renovation/alteration — the project is on level 01 of memorial hermann woodlands plaza 3, shenandoah, texas. the scope of this project includes the new equipment installation and replacement of finishes in an existing ct room
- 9191 Pinecroft Dr · Healthcare Realty TrustAug 6, 2025Spec suite 275 — renovation/alteration — a 2,043 sq ft tenant renovation finish out in pinecroft medical plaza within the woodlands · 30 m away
- 9180 Pinecroft Drive · Memorial Hermann Hospital SystemJun 26, 2026Memorial hermann medical group urology — renovation/alteration — first time buildout of an existing medical office lease space within an existing medical office building for a urology clinic · 50 m away
- 9250 Pinecroft Drive · Memorial Hermann Hospital SystemFeb 19, 2026Memorial hermann woodlands rad meic — renovation/alteration — the project is on level 01 of memorial hermann woodlands hospital and includes replacing the existing radiology imaging equipment along with minor renovations such as finish updates and infrastructure modifications · 126 m away
- 9250 Pinecroft Dr · Memorial Hermann Hospital SystemJun 19, 2025Mhwmc south tower entrance renovation — renovation/alteration — the project consists of the renovation of the entry door into the memorial hermann hospital. the work will be done on the ground floor and is approximately 379 square feet. work will include site demolition and include related utilities as require · 126 m away
- 9305 Pinecroft · Memorial HermannAug 15, 2024Uspi pinecroft asc level 3 remodel — renovation/alteration — limited demolition and construction within an existing suite. new finishes include flooring, paint, and ceiling grid and tile in the open area · 268 m away
- 1501 Research Forest Dr · Raising Cane's Usa, LLCJul 8, 2025Raising cane's (c0263) — renovation/alteration — minor architectural updates at building. exterior canopies, lighting, finishes & furniture in public areas, restroom fixtures replacement at existing locations · 276 m away
- 8850 Six Pines · Healthcare Realty Services LLCJul 31, 2025Well infused — renovation/alteration — interior tenant improvement only, no exterior work · 353 m away
- 8850 Six Pines Dr · Healthcare RealtyAug 1, 2024Modern smile center — new construction — interior build out of a dental office · 353 m away
- 8850 Six Pines Drive · Hr Acquisition Of San Antonio LtdSep 17, 2025Aesthetic house expansion — renovation/alteration — commercial office interior remodel/expansion of space from 2163/sq ft to 4,263/sq ft · 353 m away
- 1111 Medical Plaza Dr · Hsre Pinemed Mob, LPApr 8, 2024Pinemed parking expansion — renovation/alteration — a parking lot renovation / addition and restriping of parking spaces · 355 m away