8840 Cypress Water Blvd
Coppell, TX 75019 · Cypress Waters
Office interior renovations at 8840 Cypress Water Blvd
Two office interior renovation projects were registered at 8840 Cypress Water Blvd: a 28,082-square-foot SAG Corporate Office remodel filed July 30, 2024, and a 6,901-square-foot ICAT suite finish-out filed May 28, 2025. The TDLR records describe interior work, including HVAC, electrical and plumbing in the ICAT suite; both projects are marked closed.
Summarized from Texas Department of Licensing and Regulation records · updated May 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 28, 2025
- since Jul 30, 2024
- Largest scope
- 28,082 sf
- Estimated cost
- $1.1M
- state registration
Where this project stands
CompletedICAT
6,901 sq ft · $422K est.
- RegisteredMay 28, 2025
- Plan review
- ConstructionMay '25 – Nov '25
- Inspected
- Closed
Ran as a 6-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThe scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing. — cypress waters
TDLR project registrationRenovation/AlterationProject Closed6,901 sq ft$422K est.- Project #
- TABS2025019863
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Interior remodel for better flow and functionality for the building floor area in 28,082 sq ft — sag corporate office
TDLR project registrationRenovation/AlterationProject Closed28,082 sq ft$1.1M est.- Project #
- TABS2024024297
- Tenant / owner
- Sag Corporate Office
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8840 Cypress Water Blvd
What is being built at 8840 Cypress Water Blvd?
TDLR records show two office interior renovation projects: a SAG Corporate Office remodel and an interior finish-out for a suite listed as ICAT.
When were the projects at 8840 Cypress Water Blvd permitted?
The TDLR filings are dated July 30, 2024, for the SAG Corporate Office remodel and May 28, 2025, for the ICAT suite finish-out.
What is the ICAT project at 8840 Cypress Water Blvd?
The May 28, 2025, TDLR registration describes a 6,901-square-foot, non-structural interior finish-out in an existing single-floor suite, including HVAC, electrical and plumbing work. The record is marked closed.
What work was filed for the SAG Corporate Office at 8840 Cypress Water Blvd?
A July 30, 2024, TDLR registration describes a 28,082-square-foot interior remodel intended to improve flow and functionality. The project is marked closed.
Is new construction planned at 8840 Cypress Water Blvd?
The two TDLR records describe renovations and interior finish-out work, not a new building. Both projects are marked closed.
What is being renovated near Salazar Park Amenity Building?
At 8840 Cypress Water Blvd, about 43 meters from Salazar Park Amenity Building, TDLR records show a SAG Corporate Office remodel filed in July 2024 and an ICAT suite finish-out filed in May 2025.
Also being built nearby
All of 75019- 8840 Cypress Waters Blvd · Cypress WatersOct 28, 2025Receptacles, switches, installed lights and demolished walls
- 8955 Cypress Waters Blvd · Salazar Park Amenity BuildingOct 11, 2024White rhino ti — new construction — interior finish-out for a new cafe within an amenity building with landlord conference facility with finish-out · 43 m away
- 3001 Hackberry Rd · Epc-Logic, LLCOct 30, 2026Furnish & install 4-vav boxesair devices 14-supply grilles 14-lay in return grilles relocate 4-supply air diffusers · 112 m away
- 9001 Cypress Waters BlvdNov 13, 2026Mcr construct common area mail room with exterior entry · 175 m away
- 8701 Cypress Waters Blvd · Billingsley CompanyJan 24, 2025India today — renovation/alteration — remodel · 234 m away
- 8950 Cypress Waters Blvd · Billingsley CompanyJan 28, 202625.0107 mr cooper reworking existing hvac system · 320 m away
- 3001 Hackberry RdOct 12, 2026Renovation with additional offices and finish refresh · 449 m away
- 9000 Cypress Waters Blvd · Cw14 Land Ltd.Aug 3, 2026Electrical remodel · 460 m away
- 2900 Ranch Trail · Billingsley CompanyAug 15, 2025Berkshire hathaway — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite for the above named tenant. scope includes hvac, electrical, and plumbing · 473 m away
- 1484 S Beltline Rd · Qt South , LLCDec 10, 2025Quiktrip # 969 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. project 300 sq ft · 487 m away
- 3040 Ranch Trai · Cypress Waters Retail 4 LLCJul 14, 2025Sherwin 721163 irving (ih635) — renovation/alteration — 4,659 sq ft: demolish interior non-load bearing walls, remove existing finishes, construct new interior non-loadbearing walls, new office (accessory), new employee work space, new restroom · 518 m away
More offices in 75019.