8950 Cypress Waters Blvd
Dallas, TX 75019 · Mr Cooper Phase 2, Mr Cooper
Mr. Cooper Phase 2 office renovation at 8950 Cypress Waters
A Phase 2 renovation is planned for office space on levels 1 and 2 of the existing three-story building at 8950 Cypress Waters Blvd. The TDLR registration, filed June 3, 2025, lists 80,280 square feet and an applicant-estimated project cost of $4,084,693. Dallas permits filed through January 28, 2026, include HVAC work, plumbing, and a fire sprinkler room expansion.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jan 28, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Jan 28, 2026
- since Feb 25, 2025
- Largest scope
- 82,216 sf
- Estimated cost
- $7.2M
- state registration
Permit & project history
11 projectsPhase 2 terior renovation of office lease space on levels 1 & 2 of an existing 3 story office building. phase 1 has been permitted and is currently under construction (tabs2025012764). — 8950 cypress waters blvd
TDLR project registrationRenovation/AlterationProject Closed80,280 sq ft$4.1M est.- Project #
- TABS2025020438
- Tenant / owner
- Mr Cooper Phase 2
- Design firm
- Pro
- Contact
- Pro
Phase 1 interior renovation of office lease space on levels 2 & 3 of an existing 3-story office building. phase 2 shall be permitted separately and renovation scope will be on levels 1 & 2. — 8950 cypress waters blvd
TDLR project registrationRenovation/AlterationProject Closed82,216 sq ft$7.2M est.- Project #
- TABS2025012764
- Tenant / owner
- Mr Cooper
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 8950 Cypress Waters Blvd
What is being built at 8950 Cypress Waters Blvd?
The records describe a Phase 2 renovation of office space on levels 1 and 2 of an existing three-story building. The TDLR registration lists 80,280 square feet.
Is Mr. Cooper opening a new office at 8950 Cypress Waters Blvd?
The records identify the project as Mr. Cooper Phase 2, an office-space renovation. They do not say that a new office is opening.
When was the Mr. Cooper Phase 2 renovation permitted?
The TDLR project registration was filed June 3, 2025. Dallas permits for related work continued through January 28, 2026, including HVAC work under permit COM-MEC-26-000169.
How much will the renovation at 8950 Cypress Waters Blvd cost?
The TDLR registration lists an applicant-estimated cost of $4,084,693 for the project. This is an estimate, not a confirmed final cost.
What's being renovated near At Home at 9000 Cypress Waters Blvd?
At 8950 Cypress Waters Blvd, the records describe a Phase 2 renovation of office space on levels 1 and 2. The TDLR registration was filed June 3, 2025.
What's happening next to TEKsystems Global on Cypress Waters Blvd?
At 8950 Cypress Waters Blvd, Dallas permits show office renovation work, including plumbing, HVAC changes, and a fire sprinkler room expansion. The TDLR registration names the project Mr. Cooper Phase 2.
Also being built nearby
All of 75019- 9000 Cypress Waters Blvd · Cw14 Land Ltd.Aug 3, 2026Electrical remodel · 140 m away
- 9001 Cypress Waters BlvdNov 13, 2026Mcr construct common area mail room with exterior entry · 146 m away
- 8955 Cypress Waters Blvd · Salazar Park Amenity BuildingOct 11, 2024White rhino ti — new construction — interior finish-out for a new cafe within an amenity building with landlord conference facility with finish-out · 279 m away
- 8840 Cypress Water Blvd · Cypress WatersMay 28, 2025Icat — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing · 320 m away
- 8840 Cypress Waters Blvd · Cypress WatersOct 28, 2025Receptacles, switches, installed lights and demolished walls · 320 m away
- 9111 Cypress Waters Blvd · Cwop 9111 Cwb, Ltd.Dec 30, 2025Work is not being done for a specific suite. we are refeeding existing circuitry with generator backed circuitry. this work is outside of the work being done on permit com-alt-add-25-001395 · 344 m away
- 3001 Hackberry RdOct 12, 2026Renovation with additional offices and finish refresh · 398 m away
- 3001 Hackberry Rd · Epc-Logic, LLCOct 30, 2026Furnish & install 4-vav boxesair devices 14-supply grilles 14-lay in return grilles relocate 4-supply air diffusers · 427 m away
- 9121 Water Mill Road · Cw05 Land LtdMar 17, 2026Aurora dallas dfw2 new office — renovation/alteration — interior renovation of 30,975 sq ft within an existing building for an office fit-out. new exterior storefront · 438 m away
- 9121 Water Mill RdAug 31, 2026028.110319- aurora dallas building - mcr project consists of an interior renovation, including demolition and new construction, within an existing office space · 438 m away
- 1484 S Beltline Rd · Qt South , LLCDec 10, 2025Quiktrip # 969 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. project 300 sq ft · 492 m away
- 2900 Ranch Trail · Billingsley CompanyAug 15, 2025Berkshire hathaway — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite for the above named tenant. scope includes hvac, electrical, and plumbing · 532 m away
More offices in 75019.