1000 Sam Rankin Street
Corpus Christi, TX 78401 · City Of Corpus Christi
Sam Rankin Street roadway and utility reconstruction
A TDLR project registration filed May 14, 2026, describes reconstruction of Sam Rankin Street at 1000 Sam Rankin Street. The work includes roadway pavement, striping, signage, curb and gutter, stormwater lines, water and wastewater pipes, new sidewalks, and curb ramps; the applicant estimates the project cost at $9 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2026
- since May 14, 2026
- Largest scope
- 160,000 sf
- Estimated cost
- $9.0M
- state registration
Where this project stands
Under constructionSam Rankin Street Reconstruction
160,000 sq ft · $9.0M est.
- RegisteredMay 14, 2026
- Plan review
- ConstructionOct '26 – Dec '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProject consists of reconstruction of roadway pavement, striping, signage, curb and gutter, storm water lines, as well as replacement of water and wastewater pipes, addition of new 5 ft. sidewalks, and curb ramps — sam rankin street
TDLR project registrationRenovation/AlterationReview Complete160,000 sq ft$9.0M est.- Project #
- TABS2026020363
- Tenant / owner
- Sam Rankin Street Reconstruction
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1000 Sam Rankin Street
What is being built at 1000 Sam Rankin Street?
The TDLR registration describes reconstruction of Sam Rankin Street, including roadway pavement, stormwater lines, water and wastewater pipes, sidewalks, and curb ramps. It does not describe a new building.
When was the Sam Rankin Street project registered?
The project registration was filed May 14, 2026. Its TDLR project number is TABS2026020363.
How much will the Sam Rankin Street reconstruction cost?
The applicant's estimated cost for the project is $9 million. This is an estimate, not a reported final project cost.
What street improvements are planned on Sam Rankin Street?
The registration describes roadway pavement reconstruction, new striping and signage, curb and gutter work, stormwater improvements, and replacement of water and wastewater pipes. It also includes new 5-foot sidewalks and curb ramps.
What is being rebuilt near City Hall Parking Lot?
A Sam Rankin Street reconstruction project is registered at 1000 Sam Rankin Street, about 372 meters from City Hall Parking Lot Full Depth Reconstruction & Improvements. The registration describes street and utility work.
Is a new building planned at 1000 Sam Rankin Street?
The available TDLR registration describes roadway and related infrastructure reconstruction, not a new building.
Also being built nearby
All of 78401- 1114 Sam Rankin Street · City Of Corpus Christi, TexasFeb 25, 2025Harbor bridge parks mitigation — new construction — construction of 3 new city parks, renovation of 1 city park, and connecting walkway 30,000sf · 153 m away
- 1201 Leopard Street · City Of Corpus ChristiApr 22, 2026City hall parking lot full depth reconstruction & improvements — renovation/alteration — existing parking lots to be reconstructed with concrete pavement. minor stormwater improvements. various sidewalk locations to also be reconstructed to address ada parking & accessibility route requirements · 372 m away
- 1201 Leopard St Po Box 9277 · City Of Corpus Christi, Engineering ServicesOct 28, 2026Council chambers ada access upgrade — renovation/alteration — bring the chambers’ “betty turner” entrance up to meet accessibility standards as a second means of accessible entry to the chambers · 372 m away
- 1201 Leopard St · City Of Corpus ChristiOct 10, 2024Martin street - holly road to dorado street (bond 2022) — renovation/alteration — removal and replacement of existing sidewalk along public right of way and ada ramp compliance · 372 m away
- 1921 Winnebago Street · City Of Corpus ChristiFeb 19, 2025Northside aquatic center construction — new construction — construction of a new aquatic center including one pool, a bathhouse and parking · 577 m away