1201 Leopard St
Corpus Christi, TX 78401 · City Of Corpus Christi
Corpus Christi registered Martin Street sidewalk and ADA ramp work
The City of Corpus Christi registered sidewalk replacement and ADA ramp work on Martin Street, from Holly Road to Dorado Street. The TDLR project registration was filed October 10, 2024, and lists 12,000 square feet of work and an applicant-estimated cost of $200,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 10, 2024
- since Oct 10, 2024
- Largest scope
- 12,000 sf
- Estimated cost
- $200K
- state registration
Where this project stands
Finishing up · inspection nextMartin Street - Holly Road to Dorado Street (Bond 2022)
12,000 sq ft · $200K est.
- RegisteredOct 10, 2024
- Plan review
- ConstructionFeb '25 – Feb '26
- Inspectednow
- Closed
Scheduled to finish Feb 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemoval and replacement of existing sidewalk along public right of way and ada ramp compliance — city of corpus christi
TDLR project registrationRenovation/AlterationReview Complete12,000 sq ft$200K est.- Project #
- TABS2025002925
- Tenant / owner
- Martin Street - Holly Road To Dorado Street (bond 2022)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1201 Leopard St
What is being built at 1201 Leopard St in Corpus Christi?
The record for this address is a city project to remove and replace sidewalk along Martin Street, from Holly Road to Dorado Street, and bring ADA ramps into compliance. It was filed with TDLR on October 10, 2024.
What sidewalk work is planned on Martin Street in Corpus Christi?
The project calls for removing and replacing existing sidewalk in the public right of way and addressing ADA ramp compliance between Holly Road and Dorado Street. The TDLR registration number is TABS2025002925.
When was the Martin Street sidewalk project permitted?
The TDLR project registration was filed October 10, 2024. Its listed status is Review Complete.
How much will the Martin Street sidewalk project cost?
The TDLR registration lists an applicant-estimated project cost of $200,000. This is an estimate, not a reported final cost.
How large is the Martin Street sidewalk project?
The project registration lists 12,000 square feet. The described work is sidewalk replacement and ADA ramp compliance along Martin Street from Holly Road to Dorado Street.
Is a new building going up at 1201 Leopard St?
The record does not describe a new building. It identifies sidewalk and ADA ramp work on Martin Street, filed by the City of Corpus Christi on October 10, 2024.
Also being built nearby
All of 78401- 1201 Leopard Street · City Of Corpus ChristiApr 22, 2026City hall parking lot full depth reconstruction & improvements — renovation/alteration — existing parking lots to be reconstructed with concrete pavement. minor stormwater improvements. various sidewalk locations to also be reconstructed to address ada parking & accessibility route requirements
- 1201 Leopard St Po Box 9277 · City Of Corpus Christi, Engineering ServicesOct 28, 2026Council chambers ada access upgrade — renovation/alteration — bring the chambers’ “betty turner” entrance up to meet accessibility standards as a second means of accessible entry to the chambers
- 901 Leopard St · Nueces CountyFeb 20, 2024Nueces county veterans &social services renovation — renovation/alteration — selective demolition of two sperate suites that include drywall partitions, alum. storefront door, signage, suspended ceiling and floor finishes, light fixtures, and electrical utilities. construction at two separate suites for new drywall partitions · 331 m away
- 1000 Sam Rankin Street · City Of Corpus ChristiMay 14, 2026Sam rankin street reconstruction — renovation/alteration — project consists of reconstruction of roadway pavement, striping, signage, curb and gutter, storm water lines, as well as replacement of water and wastewater pipes, addition of new 5 ft. sidewalks, and curb ramps · 372 m away
- 1114 Sam Rankin Street · City Of Corpus Christi, TexasFeb 25, 2025Harbor bridge parks mitigation — new construction — construction of 3 new city parks, renovation of 1 city park, and connecting walkway 30,000sf · 506 m away
- 711 North Carancahua Street · Sfp 711 Corpus Christi LLCDec 3, 2025Centene corporation conference room expansion 12th floor — renovation/alteration — removing existing storage room to enlarge existing conference room. area of construction 546 gsf · 550 m away
- 711 N. Carancahua · Sfp 711 Corpus Christi, LLCJan 15, 2025Optum serve health services — renovation/alteration — demolish certain walls, install new walls and doors, install new millwork and provide electrical as required for new walls, paint and install flooring · 550 m away
- 711 N. Carancahuata · Sfp 711 Corpus Christi LLCOct 9, 2026Gsa:usao corpus christi — renovation/alteration — office interior remodel · 550 m away
- 805 Comanche St · City Of Corpus ChristiJan 9, 2025La retama central library exterior renovation — renovation/alteration — replace all exterior windows, replace main entrance doors, relocate accessible parking, new stairs and ramp in back of building, landscspe improvemnents · 554 m away
- 555 N Carancahua · Ed Rachal FoundationFeb 11, 2025Hdr-interior office renovations — renovation/alteration — new flooring, lighting, millwork minor wall adjustments · 559 m away
- 539 N. Carancahua · Aep Texas Central Co.Jan 16, 2026Level 17- executive conference — renovation/alteration — renovation of existing conferencing and reception areas · 563 m away
- 802 N. Carancahua St Level 6 · 802 Nc Inc.Jun 6, 2024Citgo — renovation/alteration — second generation interior buildout for full floor tenant. buildout to include new ada compliant restrooms · 576 m away