3101 Dyer St, Dallas, TX 75205
Dallas, TX 75048 · Sothern Methodist Universtiy
Lab renovation registered at SMU’s Embrey building
A 3,127-square-foot renovation of existing labs at SMU’s Embrey building was registered with the Texas Department of Licensing and Regulation on September 2, 2025. The applicant estimated the project cost at $150,000, and the registration lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- 3,127 sf
- Estimated cost
- $150K
- state registration
Where this project stands
CompletedSMU Embrey Renovation
3,127 sq ft · $150K est.
- RegisteredSep 2, 2025
- Plan review
- ConstructionOct '25 – Dec '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRenovation of existing labs — smu embrey
TDLR project registrationRenovation/AlterationProject Closed3,127 sq ft$150K est.- Project #
- TABS2026000059
- Tenant / owner
- Smu Embrey Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3101 Dyer St, Dallas, TX 75205
What is being renovated at 3101 Dyer St in Dallas?
A TDLR registration describes renovation of existing labs at SMU’s Embrey building. The 3,127-square-foot project was registered on September 2, 2025, under project number TABS2026000059.
When was the SMU Embrey lab renovation registered?
The TDLR project registration was filed on September 2, 2025. It lists the project status as closed.
How large is the SMU Embrey renovation?
The registration lists 3,127 square feet of renovation work.
How much is the SMU Embrey lab renovation estimated to cost?
The applicant’s TDLR registration estimates the project cost at $150,000. This is an estimate for the project, not a reported total construction cost.
What’s being renovated near SMU Moody Coliseum?
A 3,127-square-foot renovation of existing labs at SMU’s Embrey building was registered on September 2, 2025. The site is listed at 3101 Dyer St, near SMU Moody Coliseum.
Also being built nearby
All of 75048- 3101 Dryer Street · Southern Methodist UniversityJan 17, 2024Smu cdham education lab — renovation/alteration — 3,158 sq ft of interior repainting, 415 sq ft of new meeting room - 2 walls constructed
- 3100 Mcfarlin Blvd · Southern Methodist UniversityJul 2, 2025Smu ignited monument — new construction — new 10ft x 22ft (220sf) dedication monument · 143 m away
- 6101 Bishop Blvd · Southern Methodist UniversityJan 19, 2024Smu owen arts center — renovation/alteration — demolition and renovation of millwork and plumbing · 360 m away
- 6024 Bishop Blvd · Southern Methodist UniversityMar 25, 2024Smu afh broadcast remodel — renovation/alteration — renovation of the building that is around 5,600 sq ft to add in broadcast rooms and offices · 387 m away
- 3215 Daniel Ave · Sothern Methodist UniverstiyNov 7, 2025Smu fondren lab renovation — renovation/alteration — new finishes, lighting and mechanical · 392 m away
- 3009 Binkley Ave · Smu Moody ColiseumAug 12, 2026Smu epoch wine bar — renovation/alteration — interior renovation of approximately 3,020 square feet for tenant improvement within an existing second-floor suite of moody coliseum. the scope of work includes selective demolition, new interior finishes, door modifications, lighting upgrades, and · 400 m away
- 3225 Daniel Avenue · Southern Methodist UniversityJun 24, 2025Smu ancient dna lab renovation — renovation/alteration — total area 530 sq ft: demolition and renovation at the ground floor of the heroy science building, ancient dna lab existing rooms g25a, g25b, g25c and g25d · 400 m away
- 6401 Hillcrest Ave · Mcfarlin-Hillcrest, LLCAug 17, 2026Go greek - hillcrest dallas — renovation/alteration — new t.i. from an existing 1,440 sq ft ice cream shop to a new greek yogurt area. work includes remodeling the interior with new partitions to configure the service/customer area, a new service counter and equipment, interior finishes, new power · 403 m away
- 6407 Hillcrest Ave · Mcfarlin Hillcrest LLCFeb 16, 2024Starbucks - hillcrest & mcfarlin — renovation/alteration — work shall include new front entrance and storefront, interior partitions, interior finishes, equipment, lighting, hvac, plumbing, signage, exterior guardrail · 405 m away
- 6429 Hillcrest Ave · Pacific Retail Master LtdAug 28, 2024Kibo highland — renovation/alteration — partial interior remodeling · 414 m away
- 3411 Asbury St · 3411 Asbury LLCJun 11, 2026Rollin joe's — renovation/alteration — exterior and interior renovation and change of occupancy from restaurant to coffee shop · 424 m away
- 3109 Daniel Ave · Southern Methodist UniversityApr 15, 2024Daniel ave parking lot — new construction — new parking lot · 427 m away