3009 Binkley Ave
Dallas, TX 75205 · Smu Moody Coliseum
SMU Epoch Wine Bar interior renovation at Moody Coliseum
A 3,020-square-foot interior renovation for SMU Epoch Wine Bar is planned within an existing second-floor suite of Moody Coliseum at 3009 Binkley Ave. The TDLR project registration was filed August 12, 2026, and its status is listed as Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2026
- since Aug 12, 2026
- Largest scope
- 3,020 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Finishing up · inspection nextSMU Epoch Wine Bar
3,020 sq ft · $300K est.
- RegisteredAug 12, 2026
- Plan review
- ConstructionAug '26 – Oct '26
- Inspectednow
- Closed
Scheduled to finish Oct 19, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation of approximately 3,020 square feet for tenant improvement within an existing second-floor suite of moody coliseum. the scope of work includes selective demolition, new interior finishes, door modifications, lighting upgrades, and — smu moody coliseum
TDLR project registrationRenovation/AlterationReview Complete3,020 sq ft$300K est.- Project #
- TABS2026027613
- Tenant / owner
- Smu Epoch Wine Bar
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3009 Binkley Ave
What is being built at 3009 Binkley Ave in Dallas?
A TDLR registration describes interior tenant improvements for SMU Epoch Wine Bar in an existing second-floor suite of Moody Coliseum. It is a renovation, not a new building.
Is SMU Epoch Wine Bar opening at Moody Coliseum?
The TDLR registration identifies an interior renovation for SMU Epoch Wine Bar, but does not confirm an opening date or that the business has opened.
How large is the renovation at 3009 Binkley Ave?
The project covers approximately 3,020 square feet, according to TDLR registration TABS2026027613, filed August 12, 2026.
What work is planned for the SMU Epoch Wine Bar space?
The registration describes selective demolition, new interior finishes, door modifications, and lighting upgrades within an existing second-floor suite of Moody Coliseum.
What is being renovated near Eastline Residences at 6050 North Central Expressway?
About 343 meters away, at 3009 Binkley Ave, a TDLR registration describes a 3,020-square-foot interior renovation for SMU Epoch Wine Bar in Moody Coliseum. The registration was filed August 12, 2026.
How much is the Moody Coliseum renovation expected to cost?
The applicant's estimated cost for the project is $300,000, according to TDLR registration TABS2026027613. This is an estimate, not a confirmed final cost.
Also being built nearby
All of 75205- 6050 North Central Expressway · Eastline Dallas LLC (48%) | Harbourside Place TX Tic LLC (39%)| Topline Hsp Texas Tic LLC (13%)Jun 5, 2026Eastline residences - 1st & 8th floor renovation — renovation/alteration — partial interior renovation of existing shell space & amenities in residential tower at 1st & 8th floor. 1st floor scope 6,978 sq ft | 8th floor scope: 2,398sqft · 343 m away
- 6050 N Central ExpySep 22, 2026Electrical repairs · 343 m away
- 6060 N Central Expy · Gbtm Sendera, LLCOct 2, 2026Plumbing permit for meter no other work being done · 350 m away
- 6060 N. Central Expy. Suites 639 & 642 · 60 80a Ncx LLCSep 20, 20246th floor spec suites — renovation/alteration — non-structural interior finish out in an existing single flor suite. includes hvac, electrical, plumbing · 350 m away
- 6070 N Central Expressway · Supreme Bright Dallas Vi, LLCFeb 12, 2025Beeman - renovation — renovation/alteration — renovation to existing public spaces and exterior · 356 m away
- 6070 N Central ExpyDec 5, 2025Public r room · 356 m away
- 3100 Mcfarlin Blvd · Southern Methodist UniversityJul 2, 2025Smu ignited monument — new construction — new 10ft x 22ft (220sf) dedication monument · 398 m away
- 3101 Dyer St, Dallas, TX 75205 · Sothern Methodist UniverstiySep 2, 2025Smu embrey renovation — renovation/alteration — renovation of existing labs · 400 m away
- 3101 Dryer Street · Southern Methodist UniversityJan 17, 2024Smu cdham education lab — renovation/alteration — 3,158 sq ft of interior repainting, 415 sq ft of new meeting room - 2 walls constructed · 400 m away
- 6116 N. Central · Southern Methodist University (smu)Jul 31, 2024Ct-24m0702 — renovation/alteration — build work room and reception in open area of suite, paint and carpet · 426 m away
- 6116 N Central Expy · Southern Methodist UniversityOct 23, 2026Watts 1 1/2" model: 909 serial: 35931 replace double check in south stairs b mechanical room - watts 4" model: lf709 serial: 1417 · 426 m away
- 5910 N Central ExpyNov 17, 2026Relocate / add supply diffusers on remodel / addition space add return air diffusers on ceiling grid with open plenum return · 434 m away