Permits show an existing space becoming a courtroom
A City of Dallas permit filed October 7, 2025, describes renovating an existing space at 6116 N Central Expy into a new courtroom. Additional permits cover mechanical and electrical work, a gas meter relocation, and plumbing replacements through October 2026. The records do not give a completion date.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 23, 2026
- Projects
- 16
- 16 filings
- Latest filing
- Oct 23, 2026
- since Nov 12, 2020
- Largest scope
- 1,855 sf
- Estimated cost
- $130K
- state registration
Permit & project history
16 projectsWatts 1 1/2" model: 909 serial: 35931 replace double check in south stairs b mechanical room - watts 4" model: lf709 serial: 1417
Watts 1 1/2" model: 909 serial: 35931 replace double check in south stairs b mechanical room - watts 4" model: lf709 serial: 1417
City of Dallas permitCommercial Plumbing PermitInstall amp in electrical ,transformer , install panel, install ground bar, add plugs and outlets , & lights
Install amp in electrical ,transformer , install panel, install ground bar, add plugs and outlets , & lights
City of Dallas permitCommercial Electrical PermitRenovation to existing office space, 1855sqft — east campus tower
TDLR project registrationRenovation/AlterationProject Closed1,855 sq ft$130K est.- Project #
- TABS2025006823
- Tenant / owner
- Smu - Deason Institute For Cyber Security St. 800
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 6116 N Central Expy
What is being built at 6116 N Central Expy in Dallas?
A City of Dallas alteration permit describes renovating an existing space into a new courtroom. The permit, COM-ALT-ADD-25-001373, was filed October 7, 2025.
Is 6116 N Central Expy becoming a courtroom?
The October 7, 2025, alteration permit says the existing space is being renovated into a new courtroom. The record does not provide further details about the courtroom.
When was the courtroom renovation permit filed?
The City of Dallas filed permit COM-ALT-ADD-25-001373 on October 7, 2025.
What other work is permitted at 6116 N Central Expy?
Records include mechanical duct and diffuser work, electrical work for plugs, switches and security cameras, and a gas meter relocation. Plumbing permits filed in October 2026 cover replacing backflow prevention equipment.
When will the courtroom at 6116 N Central Expy be finished?
The permit records do not provide a completion date.
Is a restaurant opening at 6116 N Central Expy?
The available permit descriptions do not identify a restaurant opening. One alteration permit describes converting an existing space into a courtroom.
Also being built nearby
All of 75206- 6116 N. Central · Southern Methodist University (smu)Jul 31, 2024Ct-24m0702 — renovation/alteration — build work room and reception in open area of suite, paint and carpet
- 6070 N Central ExpyDec 5, 2025Public r room · 139 m away
- 6070 N Central Expressway · Supreme Bright Dallas Vi, LLCFeb 12, 2025Beeman - renovation — renovation/alteration — renovation to existing public spaces and exterior · 139 m away
- 6060 N Central Expy · Gbtm Sendera, LLCOct 2, 2026Plumbing permit for meter no other work being done · 160 m away
- 6060 N. Central Expy. Suites 639 & 642 · 60 80a Ncx LLCSep 20, 20246th floor spec suites — renovation/alteration — non-structural interior finish out in an existing single flor suite. includes hvac, electrical, plumbing · 160 m away
- 6300 N. Central Expressway · 6300 N. Central ExpresswayOct 2, 20246300 n. central expressway exterior renovation — renovation/alteration — this project is an exterior renovation to an existing building. scope of work includes the fencing off partial area of the existing parking lot, installation of a new generator, and the installation of a new exterior fire stair · 185 m away
- 6050 N Central ExpySep 22, 2026Electrical repairs · 185 m away
- 6050 North Central Expressway · Eastline Dallas LLC (48%) | Harbourside Place TX Tic LLC (39%)| Topline Hsp Texas Tic LLC (13%)Jun 5, 2026Eastline residences - 1st & 8th floor renovation — renovation/alteration — partial interior renovation of existing shell space & amenities in residential tower at 1st & 8th floor. 1st floor scope 6,978 sq ft | 8th floor scope: 2,398sqft · 185 m away
- 5538 Dyer St · Southern Methodist UniversityMar 11, 2024Smu dyer building renovation — renovation/alteration — partial renovation of existing suite 105 including two classrooms and ada restroom · 203 m away
- 5538 Dyer · Southern Methodist University Office Of FacilitiesMar 12, 2025Interior mods smu madi — renovation/alteration — interior renovation, new restrooms, new break room, 3 new studios, new lights, re-use existing hvac, new finishes · 203 m away
- 5609 Smu Blvd · Ma-Na LLCJun 30, 202640 gallon electric water heater · 246 m away
- 5606 Dyer StOct 1, 2020Electrical repairs · 298 m away