5538 Dyer
Dallas, TX 75206 · Southern Methodist University Office Of Facilities
Interior renovation planned for SMU suites at 5538 Dyer
A 3,670-square-foot interior renovation in suites 101 and 103 at 5538 Dyer includes new restrooms, a break room, three studios, lighting and finishes, with the existing HVAC reused. The project was registered with the Texas Department of Licensing and Regulation on March 12, 2025, with an applicant-estimated cost of $370,000; its status is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2025
- since Mar 12, 2025
- Largest scope
- 3,670 sf
- Estimated cost
- $370K
- state registration
Where this project stands
CompletedInterior Mods SMU MADI
3,670 sq ft · $370K est.
- RegisteredMar 12, 2025
- Plan review
- ConstructionJun '25 – Jul '26
- Inspected
- Closed
Ran as a 13-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation, new restrooms, new break room, 3 new studios, new lights, re-use existing hvac, new finishes — 5538 dyer suites 101 & 103
TDLR project registrationRenovation/AlterationProject Closed3,670 sq ft$370K est.- Project #
- TABS2025014075
- Tenant / owner
- Interior Mods Smu Madi
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5538 Dyer
What is being renovated at 5538 Dyer in Dallas?
A TDLR registration describes interior renovations in suites 101 and 103, including new restrooms, a break room, three studios, lighting and finishes. The existing HVAC is to be reused.
When was the 5538 Dyer renovation permitted?
The TDLR project registration, TABS2025014075, is dated March 12, 2025. The project status is listed as closed.
How much is the 5538 Dyer renovation expected to cost?
The applicant's estimated cost for the project is $370,000, according to its TDLR registration.
Is a new building going up at 5538 Dyer near Southern Methodist University?
The filing describes an interior renovation of existing suites, not a new building. The address is at Southern Methodist University.
What's being renovated near Ma-Na on SMU Boulevard?
The project at 5538 Dyer includes interior work in suites 101 and 103, with new restrooms, a break room and three studios. Ma-Na is listed 164 meters from the project address.
Also being built nearby
All of 75206- 5538 Dyer St · Southern Methodist UniversityMar 11, 2024Smu dyer building renovation — renovation/alteration — partial renovation of existing suite 105 including two classrooms and ada restroom
- 6300 N. Central Expressway · 6300 N. Central ExpresswayOct 2, 20246300 n. central expressway exterior renovation — renovation/alteration — this project is an exterior renovation to an existing building. scope of work includes the fencing off partial area of the existing parking lot, installation of a new generator, and the installation of a new exterior fire stair · 53 m away
- 5606 Dyer StOct 1, 2020Electrical repairs · 127 m away
- 5610 Dyer StOct 22, 2026Gas test · 136 m away
- 5619 Dyer StOct 29, 2020Erect attached sign · 155 m away
- 5609 Smu Blvd · Ma-Na LLCJun 30, 202640 gallon electric water heater · 164 m away
- 5630 Dyer StNov 16, 2026Gas test · 182 m away
- 5620 Fondren Drive · City Of University ParkDec 9, 2024University park police facility — renovation/alteration — renovating an existing warehouse into a police facility, including structural and site improvements · 197 m away
- 5620 Fondren DrOct 22, 2026Commercial fence permit · 197 m away
- 6116 N Central Expy · Southern Methodist UniversityOct 23, 2026Watts 1 1/2" model: 909 serial: 35931 replace double check in south stairs b mechanical room - watts 4" model: lf709 serial: 1417 · 203 m away
- 6116 N. Central · Southern Methodist University (smu)Jul 31, 2024Ct-24m0702 — renovation/alteration — build work room and reception in open area of suite, paint and carpet · 203 m away
- 5629 Smu BlvdNov 2, 2020Service release no work · 233 m away
More new homes in 75206.