6116 N. Central
Dallas, TX 75206 · Southern Methodist University (smu)
SMU office building renovation registered in Dallas
A 3,987-square-foot renovation is planned for the SMU office building at 6116 N. Central in Dallas. The work includes a work room and reception area in an open suite, plus painting and new carpet. The project was registered with TDLR on July 31, 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 31, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2024
- since Jul 31, 2024
- Largest scope
- 3,987 sf
- Estimated cost
- $162K
- state registration
Where this project stands
Finishing up · inspection nextCT-24M0702
3,987 sq ft · $162K est.
- RegisteredJul 31, 2024
- Plan review
- ConstructionAug '24 – Feb '25
- Inspectednow
- Closed
Scheduled to finish Feb 28, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 1 phone number
Permit & project history
1 projectBuild work room and reception in open area of suite, paint and carpet — smu office building
TDLR project registrationRenovation/AlterationReview Complete3,987 sq ft$162K est.- Project #
- TABS2024024343
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6116 N. Central
What is being built at 6116 N. Central in Dallas?
A TDLR registration describes a renovation inside an SMU office building, including a work room and reception area in an open suite, painting and carpet. The registration lists 3,987 square feet of work.
When was the renovation at 6116 N. Central registered?
The project was registered with the Texas Department of Licensing and Regulation on July 31, 2024. Its registration number is TABS2024024343.
Is this a new building at 6116 N. Central?
No new building is described in the registration. It identifies the project as a renovation and alteration at an existing SMU office building.
What will the renovation at 6116 N. Central include?
The listed work includes building a work room and reception area in an open part of a suite, along with painting and carpet. The registration describes a 3,987-square-foot project.
What is the estimated cost of the 6116 N. Central project?
The TDLR registration lists an estimated project cost of $162,000. This is the applicant's estimate, not a confirmed final cost.
What is being renovated near Southern Methodist University?
At 6116 N. Central, the SMU office building is slated for interior work to add a work room and reception area, as well as painting and carpet. The project was registered on July 31, 2024.
Also being built nearby
All of 75206- 6116 N Central Expy · Southern Methodist UniversityOct 23, 2026Watts 1 1/2" model: 909 serial: 35931 replace double check in south stairs b mechanical room - watts 4" model: lf709 serial: 1417
- 6070 N Central ExpyDec 5, 2025Public r room · 139 m away
- 6070 N Central Expressway · Supreme Bright Dallas Vi, LLCFeb 12, 2025Beeman - renovation — renovation/alteration — renovation to existing public spaces and exterior · 139 m away
- 6060 N Central Expy · Gbtm Sendera, LLCOct 2, 2026Plumbing permit for meter no other work being done · 160 m away
- 6060 N. Central Expy. Suites 639 & 642 · 60 80a Ncx LLCSep 20, 20246th floor spec suites — renovation/alteration — non-structural interior finish out in an existing single flor suite. includes hvac, electrical, plumbing · 160 m away
- 6300 N. Central Expressway · 6300 N. Central ExpresswayOct 2, 20246300 n. central expressway exterior renovation — renovation/alteration — this project is an exterior renovation to an existing building. scope of work includes the fencing off partial area of the existing parking lot, installation of a new generator, and the installation of a new exterior fire stair · 185 m away
- 6050 N Central ExpySep 22, 2026Electrical repairs · 185 m away
- 6050 North Central Expressway · Eastline Dallas LLC (48%) | Harbourside Place TX Tic LLC (39%)| Topline Hsp Texas Tic LLC (13%)Jun 5, 2026Eastline residences - 1st & 8th floor renovation — renovation/alteration — partial interior renovation of existing shell space & amenities in residential tower at 1st & 8th floor. 1st floor scope 6,978 sq ft | 8th floor scope: 2,398sqft · 185 m away
- 5538 Dyer St · Southern Methodist UniversityMar 11, 2024Smu dyer building renovation — renovation/alteration — partial renovation of existing suite 105 including two classrooms and ada restroom · 203 m away
- 5538 Dyer · Southern Methodist University Office Of FacilitiesMar 12, 2025Interior mods smu madi — renovation/alteration — interior renovation, new restrooms, new break room, 3 new studios, new lights, re-use existing hvac, new finishes · 203 m away
- 5609 Smu Blvd · Ma-Na LLCJun 30, 202640 gallon electric water heater · 246 m away
- 5606 Dyer StOct 1, 2020Electrical repairs · 298 m away