5620 Fondren Dr
Dallas, TX 75206
Permits indicate a police training center remodel in Dallas
A building at 5620 Fondren Dr is being remodeled for use as a police training center, according to a City of Dallas plumbing permit filed July 2, 2025. Later permits cover an electrical remodel, HVAC installation and commercial fences, including an 8-foot fence permit filed October 9, 2026.
Summarized from City of Dallas records · updated Oct 22, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Oct 22, 2026
- since Oct 19, 2020
- Largest scope
- —
- Listed value
- $25
- partial · often understated
Permit & project history
6 projectsSources: City of Dallas
Questions about 5620 Fondren Dr
What is being built at 5620 Fondren Dr in Dallas?
City permits describe a building remodel for a police training center. The plumbing permit, COM-PLM-25-000654, was filed July 2, 2025.
Is 5620 Fondren Dr a new building?
The available permit description says the building is being remodeled for a police training center. It does not describe a new building.
What work has been permitted at 5620 Fondren Dr?
Records include plumbing, electrical remodeling, HVAC installation and commercial fence permits. The most recent listed permit is COM-ACC-26-000285, filed October 22, 2026, for a commercial fence.
When was the police training center remodel permitted?
The plumbing permit describing the remodel was filed July 2, 2025. An electrical remodel permit followed on July 10, 2025.
What is being remodeled near Carmine's on SMU Boulevard?
At 5620 Fondren Dr, City of Dallas permits indicate a building remodel for a police training center. Carmine's is listed as a nearby landmark.
Also being built nearby
All of 75206- 5620 Fondren Drive · City Of University ParkDec 9, 2024University park police facility — renovation/alteration — renovating an existing warehouse into a police facility, including structural and site improvements
- 5619 Dyer StOct 29, 2020Erect attached sign · 170 m away
- 5606 Dyer StOct 1, 2020Electrical repairs · 175 m away
- 5610 Dyer StOct 22, 2026Gas test · 177 m away
- 5630 Dyer StNov 16, 2026Gas test · 193 m away
- 5538 Dyer · Southern Methodist University Office Of FacilitiesMar 12, 2025Interior mods smu madi — renovation/alteration — interior renovation, new restrooms, new break room, 3 new studios, new lights, re-use existing hvac, new finishes · 197 m away
- 5538 Dyer St · Southern Methodist UniversityMar 11, 2024Smu dyer building renovation — renovation/alteration — partial renovation of existing suite 105 including two classrooms and ada restroom · 197 m away
- 6300 N. Central Expressway · 6300 N. Central ExpresswayOct 2, 20246300 n. central expressway exterior renovation — renovation/alteration — this project is an exterior renovation to an existing building. scope of work includes the fencing off partial area of the existing parking lot, installation of a new generator, and the installation of a new exterior fire stair · 221 m away
- 4714 Greenville AveOct 22, 2020Electrical repairs · 266 m away
- 4724 Greenville AveAug 28, 2025New 120/240v 125a service entrance & panel; relocate meter; move main disconnect outside · 267 m away
- 4625 Greenville AveJul 8, 2025Install 151' of 8' tall iron fence. install 1- 8'x24' slide gate on vee track with 1- 4'x8' walk gate. all with new steel posts and painted flat black · 268 m away
- 4825 Greenville Ave · US Energy Square, LLCAug 4, 2026Tammy hyde — renovation/alteration — 1,810 sq ft of tenant improvement · 276 m away