1919 Amerigo Dr
Dallas, TX 75051
Roof replacement permitted at 1919 Amerigo Dr
A residential roof replacement was permitted at 1919 Amerigo Dr in Dallas on August 18, 2026. Permit RES-ROOF-26-001452 describes removing the existing shingles down to the deck, installing new underlayment and adding new 30-year shingles.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1919 Amerigo Dr
What is happening at 1919 Amerigo Dr in Dallas?
A residential roof replacement is permitted at the address. The work includes removing the shingles down to the deck and installing new underlayment and 30-year shingles.
When was the roof permit issued for 1919 Amerigo Dr?
The City of Dallas record is dated August 18, 2026. The permit number is RES-ROOF-26-001452.
What type of shingles are being installed at 1919 Amerigo Dr?
The permit description specifies new 30-year shingles, installed over new underlayment.
Is a new house being built at 1919 Amerigo Dr?
The record is for a residential roofing permit and describes a re-roof, not new-home construction.
How much will the roof work at 1919 Amerigo Dr cost?
The permit record does not include a reported project valuation or cost estimate.
Also being built nearby
All of 75051- 1923 Amerigo DrAug 13, 20252 ton straight ac system horizontal · 7 m away
- 1642 Seabreeze DrMay 12, 2025Replace 3 ton heat pump system · 62 m away
- 1651 Seabreeze DrNov 6, 2026Reroof due to weather related damages · 63 m away
- 1947 Pez DrJul 27, 20263 ton condenser change-out in backyard with 10k btus air handler change-out in attic · 80 m away
- 1931 Pez DrJul 8, 2026Composite re roof · 82 m away
- 1923 Pez DrJan 29, 2026Cleanouts in yard · 88 m away
- 1745 Nina DrMay 13, 2026Remove and replace shingles. reroof · 111 m away
- 1961 Sampsell DrAug 6, 2025Install (1) 40 gal elec water heater in garage (swap out) · 158 m away
- 1945 Sampsell DrMay 12, 2025This residential project involves removing the existing hvac system and installing new equipment, including a furnace and air conditioning unit. refrigerant and condensate lines will be replaced as needed to meet current code and ensure balanced airflow. all work will comply with local residential building and mechanical codes and will be inspected and tested upon completion · 160 m away
- 1630 Nina DrJan 2, 2026Mcr with battery energy storage system01- duracell power center maxhybrid 15 inverter and08- duracell dura5 dc-coupledbattery · 189 m away
- 1626 Nina DrJun 8, 2026Composite re roof · 192 m away
- 1913 Sampsell DrNov 12, 2025Mcr with battery installation of a 17 modules - roofmounted - 7.310 kw dc, 5.933 kw ac with 1 tesla powerwall 3 (1707000-xx-y) 13.5kwh and a 200a main panel upgrade · 195 m away