1923 Amerigo Dr
Dallas, TX 75051
1923 Amerigo Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 1923 Amerigo Dr, Dallas, TX 75051. The most recent, filed August 13, 2025, covers: “2 ton straight ac system horizontal”.
Compiled from City of Dallas records · updated Aug 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2025
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1923 Amerigo Dr
What is being built at 1923 Amerigo Dr?
The latest filing (City of Dallas permit RES-MEC-25-001766, August 13, 2025) covers 2 ton straight ac system horizontal.
How many permits and filings does 1923 Amerigo Dr have?
1 filing across 1 project, from August 13, 2025 to August 13, 2025.
Is there other construction near 1923 Amerigo Dr?
Yes. Nearby filings include 1919 Amerigo Dr (re-roof, removing shingles down to deck installed new underlayment new 30 yr shingles, Aug 18, 2026); 1642 Seabreeze Dr (replace 3 ton heat pump system, May 12, 2025); 1651 Seabreeze Dr (reroof due to weather related damages, Nov 6, 2026).
How do I get alerts for new permits at 1923 Amerigo Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75051- 1919 Amerigo DrAug 18, 2026Re-roof, removing shingles down to deck installed new underlayment new 30 yr shingles · 7 m away
- 1642 Seabreeze DrMay 12, 2025Replace 3 ton heat pump system · 62 m away
- 1651 Seabreeze DrNov 6, 2026Reroof due to weather related damages · 64 m away
- 1947 Pez DrJul 27, 20263 ton condenser change-out in backyard with 10k btus air handler change-out in attic · 79 m away
- 1931 Pez DrJul 8, 2026Composite re roof · 84 m away
- 1923 Pez DrJan 29, 2026Cleanouts in yard · 92 m away
- 1745 Nina DrMay 13, 2026Remove and replace shingles. reroof · 105 m away
- 1961 Sampsell DrAug 6, 2025Install (1) 40 gal elec water heater in garage (swap out) · 157 m away
- 1945 Sampsell DrMay 12, 2025This residential project involves removing the existing hvac system and installing new equipment, including a furnace and air conditioning unit. refrigerant and condensate lines will be replaced as needed to meet current code and ensure balanced airflow. all work will comply with local residential building and mechanical codes and will be inspected and tested upon completion · 161 m away
- 1630 Nina DrJan 2, 2026Mcr with battery energy storage system01- duracell power center maxhybrid 15 inverter and08- duracell dura5 dc-coupledbattery · 185 m away
- 1626 Nina DrJun 8, 2026Composite re roof · 187 m away
- 1913 Sampsell DrNov 12, 2025Mcr with battery installation of a 17 modules - roofmounted - 7.310 kw dc, 5.933 kw ac with 1 tesla powerwall 3 (1707000-xx-y) 13.5kwh and a 200a main panel upgrade · 199 m away