1807 Ross Ave
Dallas, TX 75201 · 3rd Floor Restrooms, 2nd Floor Corridor And Restrooms + 2 more
Direct liquid cooling infrastructure at 1807 Ross Ave
Dallas permits filed in 2026 indicate work on direct liquid cooling infrastructure for a data hall at 1807 Ross Ave. A July 31 mechanical permit covers piping, pumps and connections to cooling distribution units; electrical capacity and service work also appear in permits filed from March through September.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Sep 14, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Sep 14, 2026
- since Jun 12, 2024
- Largest scope
- 3,126 sf
- Estimated cost
- $380K
- state registration
Where this project stands
In state plan review3rd Floor Restrooms
865 sq ft · $270K est.
- RegisteredJun 12, 2024
- Plan reviewnow
- ConstructionJun '24 – Sep '24
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
11 projectsInstall interior mechanical piping system serving new direct liquid cooling (dlc) infrastructure, including: pump room piping for three (3) vfd facility water pumps, expansion tank, air separator, chemical feed, and glycol feed systems; facility water distribution piping (vertical, pump room, and data hall mains); supply/return piping connections to cdu-01 through cdu-03 with future provisions for cdu-04 through cdu-07; technology cooling piping to rack-level distribution headers; and domestic makeup water connection with backflow preventer and flow meter. rooftop adiabatic cooling equipment to be submitted under separate/subsequent application pending structural evaluation. amendment additional scope is approved for roof top work for a small water tower and condensers. amd-scope-26-001416
Install interior mechanical piping system serving new direct liquid cooling (dlc) infrastructure, including: pump room piping for three (3) vfd facility water pumps, expansion tank, air separator, chemical feed, and glycol feed systems; facility water distribution piping (vertical, pump room, and data hall mains); supply/return piping connections to cdu-01 through cdu-03 with future provisions for cdu-04 through cdu-07; technology cooling piping to rack-level distribution headers; and domestic makeup water connection with backflow preventer and flow meter. rooftop adiabatic cooling equipment to be submitted under separate/subsequent application pending structural evaluation. amendment additional scope is approved for roof top work for a small water tower and condensers. amd-scope-26-001416
City of Dallas permitCommercial Mechanical PermitRenovation to 3rd floor restrooms — 1807 ross
TDLR project registrationRenovation/AlterationProject Registered865 sq ft$270K est.- Project #
- TABS2024020634
- Tenant / owner
- 3rd Floor Restrooms
- Design firm
- Pro
- Contact
- Pro
Renovation to 2nd floor corridor and restrooms — 1807 ross
TDLR project registrationRenovation/AlterationProject Registered3,126 sq ft$380K est.- Project #
- TABS2024020629
- Tenant / owner
- 2nd Floor Corridor And Restrooms
- Design firm
- Pro
- Contact
- Pro
Renovation to 4th floor restrooms — 1807 ross
TDLR project registrationRenovation/AlterationProject Registered865 sq ft$270K est.- Project #
- TABS2024020637
- Tenant / owner
- 4th Floor Restrooms
- Design firm
- Pro
- Contact
- Pro
Renovation of tenant suite to add conference room and create demising wall to new suite. — sharyland
TDLR project registrationRenovation/AlterationProject Registered2,516 sq ft$100K est.- Project #
- TABS2024007292
- Tenant / owner
- Sharyland H&p 4th Floor Sow 4
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 1807 Ross Ave
What is being built at 1807 Ross Ave in Dallas?
Permits indicate installation of direct liquid cooling infrastructure serving a data hall, including mechanical piping and pump systems. The records do not identify an occupant or establish whether a new building is being constructed.
Is a data center being built at 1807 Ross Ave?
The July 31, 2026 mechanical permit describes cooling infrastructure serving a data hall. The permit records do not say whether this is a new data center or identify its operator.
What cooling work is planned at 1807 Ross Ave?
Permit COM-MEC-26-001850, dated July 31, 2026, describes piping for facility water pumps, cooling distribution units and rack-level distribution headers. An amendment also adds rooftop work for a small water tower and condensers.
What electrical work is permitted at 1807 Ross Ave?
City of Dallas records show an electrical capacity upgrade filed March 19, 2026, an electrical service addition filed May 8, and later electrical permits for construction and inspection or repair.
What's being built near FTI Consulting on Ross Avenue?
At 1807 Ross Ave, about 123 meters from the listed FTI Consulting address, permits indicate direct liquid cooling infrastructure serving a data hall. The records do not name an occupant.
When were permits filed for work at 1807 Ross Ave?
The five listed City of Dallas permits range from March 19 to September 14, 2026. The mechanical permit for direct liquid cooling infrastructure is dated July 31, 2026.
Also being built nearby
All of 75201- 750 N St Paul St · Trt Investors 41, LLCSep 14, 202617th floor commercial interior remodel - same use - 14,100sf · 44 m away
- 750 N. St. Paul Street · 750 Nsp Holdings, LLCOct 14, 2024Mayer 8th floor expansion — renovation/alteration — tenant improvement · 44 m away
- 750 North St. Paul Street · 750 Nsp Holdings LLCJun 2, 2025Pike engineering — renovation/alteration — tenant improvement · 44 m away
- 750 N St Paul St StNov 19, 2020Interior remodel- create spec suite for furture tenant · 44 m away
- 750 N. St. Paul Place Street · 750 Nsp Holdings, LLCDec 19, 2024Reese marketos renovation — renovation/alteration — renovation to tenant suite · 44 m away
- 1928 Ross Avenue · Fumc DallasJan 28, 2025Fumc green space improvements — new construction — sidewalk, signal, parking lot and green space improvements · 72 m away
- 1928 Ross AveMay 15, 2025Replacing rpz in boiler room · 72 m away
- 1961 Ross AveNov 19, 2020Permanent electrical service · 89 m away
- 1717 N. Harwood Street · City Of DallasJul 10, 2026Dallas museum of art municipal bond project - equipment replacement — renovation/alteration — upgrade mechanical and fire suppression systems in the building and associated architectural work · 111 m away
- 1717 N Harwood StAug 28, 2026Building alteration:city of dallas bond project to upgrade mechanical and fire suppression systems in the building city of dallas 2024 bond project id mg24ye05scope of work:1. install chiller replacement2. replace electrical switchboard3. replace air handlers4. install temperature and humidity control (controls, humidifiers, dehumidifiers)5. install temp and humidity control terminal boxes6. install exhaust ventilation system (exhaust fans)7. install controls8. fire suppression system – halon system replacement9. door / wall changes to accomodate mep replacement · 111 m away
- 1717 North Hardwood Street · City Of DallasSep 12, 2024Dallas museum of art reves + c3 gallery reconstruction — renovation/alteration — reconstruction of water damaged areas of existing reves + c3 galleries (approximately 24,400 square feet) · 111 m away
- 1717 N Akard StSep 22, 2026Mcr type 1 alteration of two existing guestrooms · 119 m away