750 North St. Paul Street
Dallas, TX 75201 · Pike Engineering, Velo It Hq
Office tenant improvements at St. Paul Place
Two office tenant improvements are registered for the multi-tenant building at 750 North St. Paul Street: one for VELO IT HQ and one for Pike Engineering. The Texas Department of Licensing and Regulation records are dated May 7 and June 2, 2025, and describe interior renovation work.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 2, 2025
- since May 7, 2025
- Largest scope
- 12,675 sf
- Estimated cost
- $1.1M
- state registration
Where this project stands
CompletedPike Engineering
3,498 sq ft · $325K est.
- RegisteredJun 2, 2025
- Plan review
- ConstructionJun '25 – Sep '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsTenant improvement — st. paul place
TDLR project registrationRenovation/AlterationProject Closed3,498 sq ft$325K est.- Project #
- TABS2025020301
- Tenant / owner
- Pike Engineering
- Design firm
- Pro
- Contact
- Pro
Tenant improvement for non-structural interior finish out in an existing single floor suite office space — st paul place
TDLR project registrationRenovation/AlterationReview Complete12,675 sq ft$1.1M est.- Project #
- TABS2025018395
- Tenant / owner
- Velo It Hq
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 750 North St. Paul Street
What is being built at 750 North St. Paul Street?
TDLR records show tenant improvements for VELO IT HQ and Pike Engineering in the multi-tenant office building. The records describe renovation work, including a non-structural interior finish-out for VELO IT HQ.
Is a new building going up at 750 North St. Paul Street?
The records describe interior tenant improvements, not construction of a new building. The VELO IT HQ project is listed as a finish-out in an existing office suite.
What work is planned for the VELO IT HQ office in Dallas?
A TDLR registration dated May 7, 2025, describes a non-structural interior finish-out in an existing single-floor office suite. The project is listed at 12,675 square feet under registration TABS2025018395.
What work is planned for Pike Engineering at St. Paul Place?
A TDLR registration dated June 2, 2025, describes a 3,498-square-foot tenant improvement for Pike Engineering. The project is listed as a renovation or alteration under registration TABS2025020301.
How much is the VELO IT HQ office renovation estimated to cost?
The applicant's estimated cost for the VELO IT HQ project is $1.1 million, according to its TDLR registration. This is an estimate for that project, not a total cost for the building.
What office work is happening near FUMC Dallas?
At 750 North St. Paul Street, about 81 meters from FUMC Dallas, TDLR records list office tenant improvements for VELO IT HQ and Pike Engineering. The registrations are dated May 7 and June 2, 2025.
Also being built nearby
All of 75201- 750 N St Paul St StNov 19, 2020Interior remodel- create spec suite for furture tenant
- 750 N. St. Paul Place Street · 750 Nsp Holdings, LLCDec 19, 2024Reese marketos renovation — renovation/alteration — renovation to tenant suite
- 750 N St Paul St · Trt Investors 41, LLCSep 14, 202617th floor commercial interior remodel - same use - 14,100sf
- 750 N. St. Paul Street · 750 Nsp Holdings, LLCOct 14, 2024Mayer 8th floor expansion — renovation/alteration — tenant improvement
- 1807 Ross Ave · Hunt Ross Akard, LLCSep 14, 2026Inspect and repair service · 44 m away
- 1928 Ross AveMay 15, 2025Replacing rpz in boiler room · 81 m away
- 1928 Ross Avenue · Fumc DallasJan 28, 2025Fumc green space improvements — new construction — sidewalk, signal, parking lot and green space improvements · 81 m away
- 1707 San Jacinto St · First Baptist DallasSep 8, 2026Install new plumbing · 103 m away
- 1961 Ross AveNov 19, 2020Permanent electrical service · 103 m away
- 1717 N Akard StSep 22, 2026Mcr type 1 alteration of two existing guestrooms · 128 m away
- 1717 N Harwood StAug 28, 2026Building alteration:city of dallas bond project to upgrade mechanical and fire suppression systems in the building city of dallas 2024 bond project id mg24ye05scope of work:1. install chiller replacement2. replace electrical switchboard3. replace air handlers4. install temperature and humidity control (controls, humidifiers, dehumidifiers)5. install temp and humidity control terminal boxes6. install exhaust ventilation system (exhaust fans)7. install controls8. fire suppression system – halon system replacement9. door / wall changes to accomodate mep replacement · 130 m away
- 1717 North Hardwood Street · City Of DallasSep 12, 2024Dallas museum of art reves + c3 gallery reconstruction — renovation/alteration — reconstruction of water damaged areas of existing reves + c3 galleries (approximately 24,400 square feet) · 130 m away
More offices in 75201.